| Cable pit at Boiler north side |
| Cable pit at Boiler north side |
| Cable pit excavation at Boiler north side |
| Boiler FD fan foundation at north side |
| Boiler PA fan foundation at south side |
| Boiler view from south |
| Boiler tripper floor |
| Boiler tripper floor |
| Fabric filter east view |
| Fabric filter view from south |
| FGD |
| Outfall culvert Turbine Hall to Aeration |
| Feedwater tank at Turbine Hall |
| Cooling water underground piping |
| Cooling water underground piping |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall - Lube oil room |
| Turbine Hall - Lube oil room |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Turbine Hall +16.0m level |
| Boiler electrical building |
| Cable drums for Boiler electrical building |
| Piperack H03 next to Boiler electrical building |
| Work area between Boiler and Piperack H03 |
| Piperack 3.1 |
| Piperack 3.1 |
| ID fans |
| FGD GRP piping |
| Piperack H03 |
| FGD Aeration basin |
| Waste water treatment plant |
| Cable trays near Light fuel oil pump station unloading area |
| Light fuel oil tank |
| BOP |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.