| Turbine hall +16.0m level |
| Turbine hall +16.0m level |
| Turbine hall +16.0m level |
| Turbine hall +16.0m level |
| Turbine hall +16.0m level |
| Turbine hall +16.0m level |
| Turbine hall Lube oil room |
| Cable trays from Unit Electrical Building to the Turbine Hall |
| Cooling water underground piping saddle foundation to Turbine Hall |
| Boiler air preheater |
| Boiler PA fan south side |
| Fabric filters |
| ID fans |
| Fabric filter compressed air building |
| FGD west view |
| FGD |
| Piperack H03 |
| Work area between Boiler and Piperack H03 |
| FGD aeration basin |
| FGD aeration basin |
| FGD GRP piping |
| Waste water treatment plant |
| FGD GRP piping |
| Auxiliary boiler |
| Cable trays from Light fuel oil pump station to Piperack H03 |
| Light fuel oil pump station |
| Light fuel oil pump station |
| Light fuel oil pump station |
| Light fuel oil pump station |
| Light fuel oil pump station |
| Light fuel oil storage tank |
| Light fuel oil storage tank piping |
| MCW piping |
| Stacker reclaimer A |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.