Monday, 9 March 2015

09.03.2015

Turbine hall condenser module
Cooling water underground piping saddle foundation to turbine hall
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Condensate make up tank
Turbine hall Lube oil room
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall +16.0m level
Turbine hall wall cladding
Unit electrical building - central control room
Turbine hall - Feed water tank
Piperack H03
Hazardous goods storage building
Emergency diesel generator

No comments:

Post a Comment

Note: only a member of this blog may post a comment.