31.May.2015 - Boiler Oil First Fire
(Milestone Achievement)
| Auxiliary boiler steam blowing |
| Auxiliary boiler steam blowing |
| Lube oil room at Turbine hall |
| Lube oil room at Turbine hall |
| Turbine hall at +16.0m level |
| Turbine hall at +16.0m level |
| Turbine hall at +16.0m level |
| Turbine hall at +16.0m level |
| Turbine hall at +16.0m level |
| Turbine hall at +16.0m level |
| Turbine hall at +16.0m level |
| Turbine hall at +16.0m level |
| Boiler view from north |
| Boiler view from north |
| Boiler view from north |
| PA/FA fans north side |
| Boiler north side |
| Boiler south side |
| Fabric filter view from north |
| Fabric filter view from south |
| ID fan |
| FGD view from south |
| FGD absorber |
| Turbine hall view from east |
| MCW header outlet at Turbine hall |
| MCW header outlet at Turbine hall |
| Cooling water piping |
| Cooling water piping |
| Cooling water piping |
| Cooling water piping |
| Cooling water piping near Turbine hall |
| Cooling water piping near Turbine hall |
| Cooling water piping near Turbine hall |
| Cooling water piping near Turbine hall |
| MCW piping on saddle foundation |
| Hazardous goods store |
| Light fuel oil tank |
| Condensate make up and Light fuel oil tanks |
| Boiler acid waste pit |
| Waste water treatment plant |
| FGD aeration basin |
| Waste water treatment plant |
| FGD aeration basin steel structure |
| FGD GRP piping |
| FGD aeration basin |
| FGD aeration basin |
| Fly ash silo |
| FF compressed air building |
| Crusher house |
| FGD GRP piping |
| FGD GRP piping |