| BC23 conveyor structure |
| Boiler view from north |
| BC23 conveyor structure |
| Boiler view from north |
| Fabric filter |
| Boiler PA fan foundation, north side |
| Boiler level +0.0m |
| MCW header at Turbine hall |
| Turbine hall masonry wall west side |
| Turbine building lifting of material |
| Piping supports at ground level Turbine hall |
| Central control room at Unit electrical building |
| Simulator room at Unit electrical building |
| Engineering room at Unit electrical building |
| Cooling water piping at Turbine hall |
| Condensate make up tank and light fuel oil tank |
| IPB |
| HV switchyard |
| MCW piping |
| Waste water treatment area |
| Condensate make up tank |
| Waste water treatment area |
| Boiler acid waste pit |
| MCW piping |
| Hazardous storage building |
| CWPH |
| Electrochlorination plant |
| CWPH |
| Turbine hall view from east |
| Hazardous storage building |
| Tanks area |
| Turbine hall view from east |
| Main transformer area |
| Turbine hall |
| Cooling water foundation |
| Cooling water piping |
| Cooling water piping |
| Cooling water piping foundation |
| CPP bulk tanks |
| Turbine hall view from north |
| Turbine hall view from west |