Thursday, 28 May 2015

27.05.2015



 27.05.2015

Boiler area general view from North

PA/FA Fan erection work - North side


Fabric filter area general view from North

Under boiler area - Scrap conveyor erection

Scrap conveyor area - civil work


Main cooling water out let area

Main cooling water piping area (No manpower working)

Cooling water piping - Critical area Section 1D

Piping - Section 1 D area (piping welding)

Ssection 1 D area

Section 1D area

Section 1D area

Section 1D area

Section 1D area


Piping Back filling - Near Turbine hall

Cooling water piping - Tie belt



Outfall roof concrete work - From Turbine hall

Outfall concrete work - From Turbine to Aeration




Waste water treatment area - pump installation

Aeration - Effluent piping and Civil concrete wall

Aeration station Header positioning

FGD pump station - civil concrete wall

Aeration basine GRP piping erection

Aeration station

PA/FA fan erection - South side