| Boiler area general view from North |
| PA/FA Fan erection work - North side |
| Fabric filter area general view from North |
| Under boiler area - Scrap conveyor erection |
| Scrap conveyor area - civil work |
| Main cooling water out let area |
| Main cooling water piping area (No manpower working) |
| Cooling water piping - Critical area Section 1D |
| Piping - Section 1 D area (piping welding) |
| Ssection 1 D area |
| Section 1D area |
| Section 1D area |
| Section 1D area |
| Section 1D area |
| Piping Back filling - Near Turbine hall |
| Cooling water piping - Tie belt |
| Outfall roof concrete work - From Turbine hall |
| Outfall concrete work - From Turbine to Aeration |
| Waste water treatment area - pump installation |
| Aeration - Effluent piping and Civil concrete wall |
| Aeration station Header positioning |
| FGD pump station - civil concrete wall |
| Aeration basine GRP piping erection |
| Aeration station |
| PA/FA fan erection - South side |