28.05.2015
Power Plant general view from West |
Fabric filter area general view from North |
Boiler area general view from North |
PA/FD fan eration - North side |
Under boiler area - conveyor erection |
Turbine North side - Preparation of Steam blow out |
Cooling water piping erection - Critical area Section 1D (also below listed) |
Cooling water piping - backfilling, near Turbine hall |
Cooling water piping Belt tie |
Out fall roof concrete work - From Turbine hall to Aeration |
Outfall roof concrete work - Turbine to Aeration |
Turbine hall - veiw from South |
Boiler area general view from South |
FGD pump station grouting work |
Aeration basin - GRP Pipe erection |
GRP Pipe erection |
Aeration basin GRP Header erection |
Absober effluent pipe erection |
FGD pump station |
Absorber supply and discharge pipe erection |
FGD area |
Main cooling water outlet pipe erection |