Thursday, 28 May 2015

28.05.2015


28.05.2015
Power Plant general view from West


Fabric filter area general view from North


Boiler area general view from North


PA/FD fan eration - North side

Under boiler area - conveyor erection


Turbine North side - Preparation of Steam blow out


Cooling water piping erection - Critical area Section 1D
(also below listed)




Cooling water piping - backfilling, near Turbine hall

Cooling water piping Belt tie


Out fall roof concrete work - From Turbine hall to Aeration

Outfall roof concrete work - Turbine to Aeration



Turbine hall - veiw from South


Boiler area general view from South

FGD pump station grouting work
Aeration basin - GRP Pipe erection

GRP Pipe erection

Aeration basin GRP Header erection

Absober effluent pipe erection

FGD pump station




Absorber supply and discharge pipe erection

FGD area



Main cooling water outlet pipe erection

No comments:

Post a Comment

Note: only a member of this blog may post a comment.