| Boiler view from north |
| Coal crusher house |
| Fabric filter |
| FD/PA fans foundations north side |
| Cooling water pipes |
| Cooling water pipes |
| Cooling water pipes being lifted into position |
| Cooling water pipes being lifted into position |
| Cooling water pipes |
| Cooling water pipes |
| Cooling water pipes |
| Cooling water pipes |
| Cooling water pipes |
| Cooling water pipes |
| Cooling water pipes |
| Shaft alignment in progress |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Lube oil room |
| Turbine hall Level +16.0m |
| MCW piping |
| Turbine hall Level +16.0m |
| Turbine hall Level +16.0m |
| Lube oil room |
| Waste water treatment plant |
| Waste water treatment plant |
| Waste water treatment plant |
| FGD aeration basin |
| Light fuel oil tank |
| Condensate make up tank |
| Boiler acid waste pit |
| Demin plant |
| Raw water tanks |
| Condenser neck prepare for welding |
| Condenser neck prepare for welding |
| Waste water treatment plant |
| Boiler electrical building piperack |
| FD/PA fans foundations south side |
| Fabric filter |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.