Boiler view from north |
Coal crusher house |
Fabric filter |
FD/PA fans foundations north side |
Cooling water pipes |
Cooling water pipes |
Cooling water pipes being lifted into position |
Cooling water pipes being lifted into position |
Cooling water pipes |
Cooling water pipes |
Cooling water pipes |
Cooling water pipes |
Cooling water pipes |
Cooling water pipes |
Cooling water pipes |
Shaft alignment in progress |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Lube oil room |
Turbine hall Level +16.0m |
MCW piping |
Turbine hall Level +16.0m |
Turbine hall Level +16.0m |
Lube oil room |
Waste water treatment plant |
Waste water treatment plant |
Waste water treatment plant |
FGD aeration basin |
Light fuel oil tank |
Condensate make up tank |
Boiler acid waste pit |
Demin plant |
Raw water tanks |
Condenser neck prepare for welding |
Condenser neck prepare for welding |
Waste water treatment plant |
Boiler electrical building piperack |
FD/PA fans foundations south side |
Fabric filter |