Monday, 30 September 2013

30.09.13 Aerial Photograph September 13


Power block General view from East

B33. Unit Electrical building, B63. Turbine Hall,
B68 Transformer Area, view from East

                                            Boiler duct assembly - Power block east area   

                                        Power block general view from West
                                        B01. Boiler Steel structure & duct erection,
                                        B35. Boiler electrical building ground floor work,
                                        B10. ID Fan foundation,
                                        D01. Ash storage - Pile cap preparation

                                        B02. Chimeny erection, B17 Flue gas duct foundation,
                                        L05. Absorber foundation - View from East
                                          
                                        L13. Aeration Basine

C04. Coal Yard & Coal Handling 
Sub contractor's Office and Laydown area

                                                      E50. Cooling water outfall,
                                                   TT16 & TT17 Transfer tower
                                        
                                        C04, Coal Yard South side,
                                        Stack reclaimer foundation Casting

                                        E02. Cooling water pump house

                                        E02. Cooling water piping support sleepers
                                                        F01. Switch yard

Thursday, 26 September 2013

27.09.2013

B01. Boiler steel structure erection,
view from East


B01. Boiler steel structure erection,
view from Southeast


B01. Boiler steel structure erection,
view from North


B01. Boiler Duct erection


B01. Boiler steel structure erection,
view from West


B06. Bunker bay steel structure erection,
view from South


B01. Boiler duct erection


B02. Chimney Slipform ring erection


B07. Fabric Filter pile cap preparation


B10. ID Fans foundation area


B17. Flue Gas Ducts foundation rebar fixing,
view from West


B17. Flue Gas Ducts foundation rebar fixing,
view from North


B33. Unit Electrical Building 1st floor column concreting,
view from Southeast


B35. Boiler Electrical Building 1st floor slab formwork,
view from East


B63. Turbine Hall civil work





B68. Transformer firewall rebar & formwork,
view from Southwest


C05. Coal Crusher House pile cap preparation 


C07. TT023 Transfer Tower dewatering


C40. Light Fuel Oil Storage foundation lean concreting


C71. Coal Crusher House Electrical Substation
foundation pedestal concreting


D04. Fly Ash Conveyor pile cap preparation


D20. Fabric Filter Compressed Air Building
excavation, view from East


F01. Switchyard Section 2 equipment steel erection


F01. Switchyard Section 3 Gantry steel structure
preparation


F01. Switchyard Section 1 foundation rebar fixing


F01. Switchyard Section 5 foundation formwork


F01. Switchyard Section 2 foundation concreting


G05. Demin Water Treatment Plant foundation rebar fixing


G06. Demin Water Neutralization foundation rebar & formwork


G07. Demin Water Storage Tank foundation piling


L05. FGD Absorber foundation rebar


L10. FGD Booster Fans foundation area rebar fixing


L13. FGD Aeration Bassin pile cap preparation


L24. FGD Ducts foundation pile cap preparation

Wednesday, 25 September 2013

25.09.2013


B01. Boiler steel structure & duct erection,
view from Northeast


B01. Boiler steel structure erection,
view from West 


B01. Boiler steel structure erection,
view from East 


B01. Boiler steel structure erection,
view from North 


B02. Chimney Slipform ring erection 


B06. Bunker bay steel structure erection, 
view from South 


B07. Fabric Filter pile cap preparation 


B17. Flue Gas Ducts foundation rebar fixing,
view from North 


B17. Flue Gas Ducts foundation rebar fixing,
view from East 


B33. Unit Electrical Building 1st floor column concreting,
view from South 


B33. Unit Electrical Building 1st floor column concreting,
view from West 


B35. Boiler Electrical Building ground floor roof
 formwork preparation 


B63. Turbine Hall civil works 




B68. Transfomer firewall rebar & formwork,
view from Southwest 


B68. Transfomer firewall rebar fixing,
view from Northeast 


C05. Coal Crusher House foundation pile plug 


C07. Coal Crusher House Electrical Substation 


C40. Light Fuel Oil Storage pile cap preparation


C71. Coal Crusher House Electrical Substation
foundation formwork


D20. Fabric Filter Compressed Air building area excavation


F01. Switchyard Section 2 equipment steel structure erection


F01. Switchyard Section 5 foundation formwork


F01. Switchyard Section 3 steel structure erection preparation


F01. Switchyard Section 2 foundation rebar fixing


G05. Demin Water Treatment Plant foundation
rebar fixing


G06. Demin Water Neutralization foundation
rebar & formwork


G07. Demin Water Tank piling


L05. FGD Absorber foundation rebar fixing


L10. ID Fans foundation area


L13. FGD Aeration Bassin pile plug preparation


L24. FGD Ducts pile plug preparation


C04. Coal Yard Reclaimer Line A rebar fixing


C04. Coal Yard Reclaimer Line B concreting


C07. TT16 Transfer Tower steel structure erection 


C73. Coal Handling House Electrical Substation
excavation