B01. Boiler steel structure erection,
view from East
B01. Boiler steel structure erection,
view from Southeast
B01. Boiler steel structure erection,
view from North
B01. Boiler Duct erection
B01. Boiler steel structure erection,
view from West
B06. Bunker bay steel structure erection,
view from South
B01. Boiler duct erection
B02. Chimney Slipform ring erection
B07. Fabric Filter pile cap preparation
B10. ID Fans foundation area
B17. Flue Gas Ducts foundation rebar fixing,
view from West
B17. Flue Gas Ducts foundation rebar fixing,
view from North
B33. Unit Electrical Building 1st floor column concreting,
view from Southeast
B35. Boiler Electrical Building 1st floor slab formwork,
view from East
B63. Turbine Hall civil work
B68. Transformer firewall rebar & formwork,
view from Southwest
C05. Coal Crusher House pile cap preparation
C07. TT023 Transfer Tower dewatering
C40. Light Fuel Oil Storage foundation lean concreting
C71. Coal Crusher House Electrical Substation
foundation pedestal concreting
D04. Fly Ash Conveyor pile cap preparation
D20. Fabric Filter Compressed Air Building
excavation, view from East
F01. Switchyard Section 2 equipment steel erection
F01. Switchyard Section 3 Gantry steel structure
preparation
F01. Switchyard Section 1 foundation rebar fixing
F01. Switchyard Section 5 foundation formwork
F01. Switchyard Section 2 foundation concreting
G05. Demin Water Treatment Plant foundation rebar fixing
G06. Demin Water Neutralization foundation rebar & formwork
G07. Demin Water Storage Tank foundation piling
L05. FGD Absorber foundation rebar
L10. FGD Booster Fans foundation area rebar fixing
L13. FGD Aeration Bassin pile cap preparation
L24. FGD Ducts foundation pile cap preparation