B01. Boiler steel structure erection,
view from East
B01. Boiler duct erection
B01. Boiler steel structure & duct erection,
view from South
B01. Boiler steel structure & duct erection,
view from Southwest
B02. Chimney Slipform ring erection
B07. Fabric Filter dewatering completed,
view from South
B07. Fabric Filter view from North
B10. ID Fans foundation area,
view from South
B17. Flue Gas Ducts foundation rebar fixing,
view from West
B17. Flue Gas Ducts foundation rebar fixing,
view from North
B33. Unit Electrical Building 1st floor column
rebar fixing, view from Northeast
B33. Unit Electrical Building 1st floor column
formwork, view from Southwest
B35. Boiler Electrical Building 1st floor foudation
preparation, view from East
B63. Turbine Hall civil work
B68. Transformer firewall rebar fixing,
view from Northeast
B68. Transformer firewall rebar & formwork,
view from Southwest
C04. Coal Yard area
C04. Coal Yard Reclaimer Line A rebar & formwork,
view from Southeast
C04. Coal Yard Reclaimer Line B concreting,
view from Southeast
C05. Coal Crusher House foundation rebar preparation
C06. Coal Belt Conveyor pile plug preparation,
view from B01 North
C07. TT16 Transfer Tower steel structure erection
C07. TT17 Transfer Tower foundation concreting completed
C07. TT18 Transfer Tower piling,
view from East
C07. TT23 Transfer Tower foundation dewatering
C07. TT19 Transfer Tower foundation excavation,
view from North
C40. Light Fuel Oil Storage pile cutting,
view from North
C71. Coal Handling House Electrical Substation
formwork
C73. Coal Handling Coal Yard Electrical Substation
excavation
D01. Fly Ash Storage foundation preparation
E02. MCW Pumphouse excavation
E02. MCW Pumphouse South tie-in slab rebar fixing
E05. MCW Piping saddle rebar & formwork
E06. Electrochlorination Building piling completed
E50. MCW Culvert struts erection
F01. Switchyard Section 2 equipment steel structural erection
F01. Switchyard Section 2 foundation rebar & formwork,
view from South
F01. Switchyard Section 3 Gantry erection preparation
G05. Demin Water Treatment Plant foundation
rebar fixing
G06. Demin Water Neutralization foundation
rebar & formwork
L05. FGD Absorber foundation rebar fixing
L10. FGD Booster Fans foundation area lean concreting
L13. FGD Aeration Bassin pile cutting
L24. FGD Ducts pile plug preparation