Monday, 30 September 2013

30.09.13 Aerial Photograph September 13


Power block General view from East

B33. Unit Electrical building, B63. Turbine Hall,
B68 Transformer Area, view from East

                                            Boiler duct assembly - Power block east area   

                                        Power block general view from West
                                        B01. Boiler Steel structure & duct erection,
                                        B35. Boiler electrical building ground floor work,
                                        B10. ID Fan foundation,
                                        D01. Ash storage - Pile cap preparation

                                        B02. Chimeny erection, B17 Flue gas duct foundation,
                                        L05. Absorber foundation - View from East
                                          
                                        L13. Aeration Basine

C04. Coal Yard & Coal Handling 
Sub contractor's Office and Laydown area

                                                      E50. Cooling water outfall,
                                                   TT16 & TT17 Transfer tower
                                        
                                        C04, Coal Yard South side,
                                        Stack reclaimer foundation Casting

                                        E02. Cooling water pump house

                                        E02. Cooling water piping support sleepers
                                                        F01. Switch yard

No comments:

Post a Comment

Note: only a member of this blog may post a comment.