B01. Boiler steel structure & duct erection,
view from Northeast
B01. Boiler steel structure erection,
view from West
B01. Boiler steel structure erection,
view from East
B01. Boiler steel structure erection,
view from North
B02. Chimney Slipform ring erection
B06. Bunker bay steel structure erection,
view from South
B07. Fabric Filter pile cap preparation
B17. Flue Gas Ducts foundation rebar fixing,
view from North
B17. Flue Gas Ducts foundation rebar fixing,
view from East
B33. Unit Electrical Building 1st floor column concreting,
view from South
B33. Unit Electrical Building 1st floor column concreting,
view from West
B35. Boiler Electrical Building ground floor roof
formwork preparation
B63. Turbine Hall civil works
B68. Transfomer firewall rebar & formwork,
view from Southwest
B68. Transfomer firewall rebar fixing,
view from Northeast
C05. Coal Crusher House foundation pile plug
C07. Coal Crusher House Electrical Substation
C40. Light Fuel Oil Storage pile cap preparation
C71. Coal Crusher House Electrical Substation
foundation formwork
D20. Fabric Filter Compressed Air building area excavation
F01. Switchyard Section 2 equipment steel structure erection
F01. Switchyard Section 5 foundation formwork
F01. Switchyard Section 3 steel structure erection preparation
F01. Switchyard Section 2 foundation rebar fixing
G05. Demin Water Treatment Plant foundation
rebar fixing
G06. Demin Water Neutralization foundation
rebar & formwork
G07. Demin Water Tank piling
L05. FGD Absorber foundation rebar fixing
L10. ID Fans foundation area
L13. FGD Aeration Bassin pile plug preparation
L24. FGD Ducts pile plug preparation
C04. Coal Yard Reclaimer Line A rebar fixing
C04. Coal Yard Reclaimer Line B concreting
C07. TT16 Transfer Tower steel structure erection
C73. Coal Handling House Electrical Substation
excavation