Aerial Photo Graph - February 2014
Plant overall veiw from East
|
![]() |
| Power block East Side F06. Cable way foundation Transfermer to Switchyard, E05. Cooling water piping sleeper foundation G28. Oil & Fire fighting water recovery pit |
![]() |
| G02. Raw water storage G07. Demineralized water storage. G05. Demineralized water production G06. Demineralized water effluents G25. Operational industrial water pump station |
![]() |
| B01. Boiler pressure parts assembly area and Tank area |
![]() |
| E05. Cooling water piping sleeper foundation |
![]() |
| L13 Aeration basin foundation |
![]() |
| Aeration basin foundation |
![]() |
| Material Lay down area |
![]() |
| Switchyard |
![]() |
| E50. Outfall cultvert. C73. Electrical building, Tranfering Tower TT16 & 17 |
![]() |
| C04 Coal yard, Transfer tower TT20 & 21 |
![]() |
| Coal Yard Stack reclaimer area |
![]() |
| E02. Cooling pump station & Intake area E07. Cooling water electrical building |
![]() |
| Material laydown area |
![]() |
| Material laydown area |
![]() |
| New lay down area |
![]() |
| New laydown area |