| B01. Boiler pressure parts item for lift |
| B01. Boiler pressure parts erection, view from bottom |
| B01. Boiler steel structure & duct erection, view from North |
| B06. Bunker bay steel structure & silo duct erection |
| B01 Boiler steel structure. B07. Fabric filter steel structure erection View from West |
| B06. Bunker bay area Mill foundation on going |
| B63. Turbine hall area Tower crane erection |
| B07. Fabric filter area steel structure erection |
| B07 Fabric filter casing assembly |
| B33. Unit electrical building ground floor, HVAC material at site |
| B33. Unit electric building 1st floor plastering work |
| B33. Unit electrical building near transformer eraa |
| B33. Unit electrical building view from South |
| B35. Boiler electrical building, plastering work |
| B35. Boiler electrical building ground floor |
| B35. - Hvac material at site |
| B35. Boiler electrical building, auxiliary transformer area |
| B63. Turbine hall |
| B63. Turbine hall _ |
| B63. Turbine hall |
| B63. Turbine hall |
| B68. Auxiliary Transformer building side wall rebar installation |
| B68. Main Transformer building, concrete repair work |
| C03. Fuel Oil pump station |
| C05. Crusher house first floor slab concreting work |
| C30. Fuel oil unloading area foundation work |
| C72. Electrical building near crusher house |
| C72. Electrical building near bunker house |
| 2nd tower crane erection for Turbine hall |
| 1250 Ton Crane dismanteling |
| D01. Ash storage foundation work |
| G05. Demineralized water proudction equipment eretion |
| G17. Auxiliary boiler foundation |
| G18. Reserve feed water storage |
| G25. Operational industrial water pump station |
| B33. Unit electrical building area HVAC material at site |
| L05. Abosrber shell side wall concreting work |
| L24. FGD duct foundation work |
![]() |
| L40. Light fuel oil retention work |
![]() |
| B01. Boiler steel structure erection, Duct & Silo duct erection and pressure parts erection, view from west |
![]() |
| L13. Aeration basin foundation work |
![]() |
| B01. Boiler pressure parts assembly at site |
![]() |
| B01. Steel structure erection, view from South |
![]() |
| B01. Boiler steel structure, pressure parts & duct erection view from West |
![]() |
| F06. Cable bay foundation |
![]() | ||
| E02. Cooling water pump house
|