G05. Demineralized water production equipment
erection started on 05-02-2014
B01. Boiler pressure parts item lifting
B01. Boiler steel structure and
B07. Fabric filter steel structure erection
B01. Pressure parts erection
B01. Pressure parts assembly at site
B01. Boiler steel structure & duct erection
view from South
B01. Piping erection
B01. Steel structure &
B07 Steel structure erection general view
B06. Bunker Bay area steel structure
and silo duct erection
B06. Bunker bay area
B07. Fabric filter steel preassembly area
B07. Fabric filter casing assembly
B07. Steel structure erection
G17. Auxiliary boiler foundation work
B33. Unit electrical building
3rd floor slab concreting
B33. Unit electrical building ground floor,
electrical work
B33. Unit electrical building 1st floor,
plastering work
B35. Boiler electrical building,
3rd floor column erection
B63. Turbine hall basement concrete slab
B63, Turbine hall - South end rebar installation
B63. Turbine hall basement concrete,
view from North
C40. Light fuel oil retention work
C71. Electrical building near crusher house
C72. Electrical building near bunker bay
D01. Ash Storage foundation work
F06. Cable way foundation