Friday, 14 February 2014

07.02.2014




B01. Boiler steel structure, Temporary lift installation,
view from North

B06. Bunker Bay area, Steel structure, grating,
handrail & Silo duct erection


B01. Boiler pressure parts assembly at site


B01. Boiler Steel structure, Duct, pressure parts erection

B01. Boiler steel structure, pressure parts erection,
B07. Fabric filter Steel structure erection , view from West


Pipng material at site for erection

B06. Bunker bay area, Mill area civil work in progress



B07. Fabric Filter area steel structure erection, ID Fan foundation

B33. Unit Electrical building, 1st floor plastering work


B33. Unit electrical building, transformer area slab concrete,
view from East

B33. Unit electrical building, view from South


B63. Turbine hall, South end steel rebar installation


B63. Turbine hall concrete slab



B63. Turbine hall South end- Concrete slab

B63. Turbine hall general view from North

B68. Auxiliary transformer building side wall rebar installation

C03. Pile cap preparation

C30. Fuel oil unloading area


B68 Main transformer building concrete repair work

C05. Crusher house area column erection

C40. Light fuel oil retention work

C71. Electrical building near crusher house


1250 Ton Crane Dismanteling


D01. Ash storage foundation work

E05. Cooling water piping sleeper foundation


G05. Equipment erection

G10. Emergency diesel generator foundation

G16. Waste water treatment plant pile cap preparation

G25. Operational Industrial water pump station foundation

B35. Boiler electrical building plastering work


B35. Boiler electrical building Ground floor

B07. Fabricl filter hopper and casing assembly


L05 Absorber shell side wall rebar installation


L13. Aeration basine foundation work
                                   