B01. Boiler pressure parts item positioning for lift

B01. Pressure parts item for lift

B01. Pressure parts assembly at site
B01. Boiler pressure parts assembly at site


C40. Light fuel oil storage retention work

B01. Boiler steel structure & duct erection,
B06. Bunker bay Steel structure & Silo Duct erection,
view from East


B01. Boiler steel structure & duct erection,
view from South
B06. Bunker bay steel structure and Silo duct erection
view from East

B07. Fabricl filter steel structure &
B01. Steel structure, pressure parts & duct erection,
view from West



B01. Boiler pressure parts header item ready for lift

B06. Bunker bay area Mill foundation concrete reform work


B06. Bunker bay area Mill foundation concreted

B07. Fabric filter steel structure erection, view from East


B07. Flue gas duct foundation area Hopper casing assembly

B07. Hopper casing assembly


B07. Hopper & casing assembly

B33.  Unit Electrical building & transformer area,
3rd floor concreted slab
View from East


B33. Unit electrical building Ground floor,
HVAC material at site


B33. Unit electrical building 1st floor plastering and painting




B33. Unit electrical building, view from South

B35. Boiler electrical building view from East

B35. Boiler electrical building
Ground floor plastering and painting


B63. Turbine hall rebar installation and
removal of temporary plate for crane

B63. Turbine hall South end rebar installation

B63. Turbine hall rebar installation


B63. Turbine hall, General view from North side,
and Tower crane
 
C03. Fuel oil pump station - pile cape preparation



C30. Fuel oil unloading area

 
C71. Electrical building near Crusher house
2nd floor slab concrete

C72. Electrical building near Bunker bay

1250 Ton Crane Dismanteling for demobilize

D01. Ash storage foundation

E05. Cooling water piping sleeper foundation (piling extension)


F06. Cable way foundation

G05. Demineralized water production equipment erection


G17. Auxiliary boiler foundation work 

G18. Reserve feed water storage


G25.Operational industrial water pump station
view from North


G25. Operational industrial water pump station
View from South

G28. Oil & Fire Fighting water recovery Pit -Sheet piling


L05. Absorber side wall rebar installation
view from South


L05. Absorber side wall rebar installation
view from North

L13. Aeration basin foundation rebar installation


L24. FGD Duct foundation pile cap preparation 