Friday, 15 November 2013

15.11.2013




B01. Steel Structure Tier 5 erection and 
Hot & Cool air duct erection, view from South

B06. Bunker Bay area Steel structure Tier 5
and Silo duct erection, view from West 

B02.Chimney erection

B07. Fabric filter replacement of pile

B33. Unit Electrical building, view from East

B33. Unit electrical building
2nd floor coloumn work, view from south

B35. Boiler Electrical building,
First floor concrete slab work, view from South

B35. Boiler Electrical building, Ground floor
 & First floor concrete slab work, view from West

B35. Boiler electrcial building, Auxiliary
Transformer foundation work

B63. Turbine Hall


B63. Turbine Hall Concrete pouring
for basement slab (NCR) 

Turbine hall area over bridge work

B68. Transformer building,
side wall concrete work, view from North

B68. Transformer building,
side wall concrete work, view from East

C05. Crusher house Foundation,
concrete and rebar installation, view from East

C71. Electrical building near Crusher House,
Ground floor slab concreting work

G02. Raw Water Storage
foundation rebar installation

G05. Demineralized water production
plant foundation concrete

L05. Absorber foundation,
steel rebar installation, view from East

L10. Booster fan fan and pedestal

L13. Aeration basin area
sheet piling, and excavation 

Coal Handling Transfer Tower
TT16 - Steel structure erection


Coal handling Transfer Tower
TT17 - Steel structure erection

Coal handling Transfer Tower
TT20 - Steel structure erection

Coal handling Transfer Tower
TT21 - Steel structure Erection