B01. Steel Structure Tier 5 erection and
Hot & Cool air duct erection, view from South
B06. Bunker Bay area Steel structure Tier 5
and Silo duct erection, view from West
B02.Chimney erection
B07. Fabric filter replacement of pile
B33. Unit Electrical building, view from East
B33. Unit electrical building
2nd floor coloumn work, view from south
B35. Boiler Electrical building,
First floor concrete slab work, view from South
B35. Boiler Electrical building, Ground floor
& First floor concrete slab work, view from West
B35. Boiler electrcial building, Auxiliary
Transformer foundation work
B63. Turbine Hall
B63. Turbine Hall Concrete pouring
for basement slab (NCR)
Turbine hall area over bridge work
B68. Transformer building,
side wall concrete work, view from North
B68. Transformer building,
side wall concrete work, view from East
C05. Crusher house Foundation,
concrete and rebar installation, view from East
C71. Electrical building near Crusher House,
Ground floor slab concreting work
G02. Raw Water Storage
foundation rebar installation
G05. Demineralized water production
plant foundation concrete
L05. Absorber foundation,
steel rebar installation, view from East
L10. Booster fan fan and pedestal
L13. Aeration basin area
sheet piling, and excavation
Coal Handling Transfer Tower
TT16 - Steel structure erection
Coal handling Transfer Tower
TT17 - Steel structure erection
Coal handling Transfer Tower
TT20 - Steel structure erection
Coal handling Transfer Tower
TT21 - Steel structure Erection