B01. Boiler Steel strucuture &
Duct erection, view from North
B01. Steel structure Grating installation
B01. Steel Structure Tier 5 & 6 erection,
B06. Bunker Bay Structure and Silo duct erection,
view from South
B01. Steel Structure & Duct erection,
view from West
B06. Bunkery bay area general view from North
B06. Steel structure and Silo duction erection,
view from East
B02. Chimney erection
B33. Unit electrical building
2nd Floor Transf. area side wall erection
B33. Unit Electrical Building,
2nd floor column erection, view from west
B35. Boiler electrical building,
first floor column erection, view from north
B35. Boiler electrical building
and Auxiliary Transfermer area, view from South
B63. Turbine hall - civil work
view from North
B63. Turbine hall area over bridge South side
B63. Turbine hall civil work, view from South
B68. Transformer building
2nd step side wall erection, view from North
C05. Crusher house Foundation concrete work
C71. Electrical building near Crusher house,
First floor slab concrete work
C40. Light Fuel Oil Storage Tank area
Crane Asssembly at site
D01. Ash storage pile digging
G02. Raw Water Storage foundation concrete
G02. Raw water storage rebar installation
G05. Demineralized water production area
slab concrete work
G07. Demineralized water storage
Hopper Assemly at site
L05. Absorber shell rebar installation
L10. Booster fan foundation and pedestal
E50. Cooling water culvert
E50. Cooling water Culvert, steel rebar installation
E50. Cooling water slab concreting (partialy)
Coal Handling transfer Tower
TT16 Steel structure erection
Coal Handling Transfer Tower
TT17 steel structure erection
Coal handling Transfer Tower
TT21 steel structure erection
Transfer Tower TT20 steel structure erection
Transfer Tower TT19 Foundation