Wednesday, 27 November 2013

27.11.2013





B01. Boiler Steel structure
Tier 5 & 6 erection, view from West

B06. Bunker bay area Steel structure
&  Silo duct erection, view from East

B07 Fabric Filter area Pile cap
and lean concrete work, view from East

B02. Chimney erection, view from bottom

B02. Chimney erection bottom area

B33. Unit Electric Building,
2nd floor column erection, 1st floor plastering

B35. Boiler Electrical building, view from North

B63. Turbine hall,
view from North side




B63. Turbine  - rebar installation
& concrete reform work,
view from South Side



C05. Crusher house foundation work

C71. Electrical building near Crusher house
C72. Electrical building near bunker bay

Crane - Assembly - 1200 Ton



D01. Ash storage, pile cap preparation

L05. Absorber foundation slab concrete

L13. Aeration Basement Sheet piling