Wednesday, 30 April 2014

29.04.2014 - Aerial Photograph April 2014



Aerial Photo Graph April -2014


Power block General view from East
 
Turbine hall overall view from Top

Water Treatment Area

Power block view from West

Chimney Area

Aeration basin area

Coal Yard & Coal handling system erection, view from South

Coal Yard South Side, Cooling water Outfal and
Coal handling system erection

Coal Yard view from North
Coal Handling system erection

Caol Yard - Coal handling system Electrical building & Tower

Switch Yard Gantry erection

Power Plant overall view from East

Cooling water pump and Intake

Material laydown area

Material laydown area 2

Material laydown area - New 1

Material laydown area new 2


E06. Electrochlorination platn & E02 Pump house


Monday, 28 April 2014

29.04.2014

ADV Module assembly

B01. Rear Side Steel structure erection

B01. Boiler pressure parts erection, view from North

B01. Pressure parts erection, view from North

B01. Pressure parts erection, view from Bottom

B01. Boiler steel structure erection , veiw from East

B01. Boiler steel structure & duct erection,
View from South


B01. Boiler steel strcture & Pressure parts erection,
B07. Fabric filter casing erection
View from West

B06. Bunker bay area sole plate installation

B06. Bunker bay area sole plate installation

B07. Fabric filter hopper casing erection, view from North

B17. Flue gas duct assembly and erection,
and steel structure erection

B33. Unit electrical building ground floor cable tray installation

B33. Unit electrical building transformer area, view from East

B33. Unit electrical building view from South

B35. Boiler electrical building, veiw from East, painting

B35. Boiler electrical building, ground floor cable tray erection

B35. Boiler electrical building First floor HVAC Duct work,
and flooring

B63. Turbine hall, Ground floor slab concrete & Piller work
View from West

B63. Turbine hall  ground floor slab rebar installation

B63. Turbine hall South side rebar installation


B06. Bunker bay mill area sole plate installation

B63. Turbine hall viewfrom North

B63. Turbine hall steel structure erection, view from North

B68. Auxiliary Transformer side concrete and bore piling

b68. Main transformer building plastering and grating work

B63. Turbine hall steel structure erection, view from East

C72. Electrical building near bunker bay area

D01. Ash storage structure concrete pouring

E05. Cooling water piping sleeper foundation work


E05. Demin. water proudction equipment erection

G08. Compressed air production
Foundation and column ereciton

G25. Operational Industrial water pump station
Steel structure erection

G25. Operational industrial water pump station
Building side plastering work

L13. Aeration station basement slab concrete work 

L13. Aeration station piling work

L13. Aeration basin slab concrete work