| ADV Module steel structure assemble |
| B01. Boiler presssure parts erection |
| B01. Boiler pressure parts erection, view from bottom |
| B01. Boiler pressure parts erection, view from bottom |
| B06. Bunker bay area Silo duct, Steel structure erection, B01. Boiler steel structure erection |
| B01. Pressure parts assembly |
| B01/B06 Steel structure erection, view from East |
| B01. Boiler steel structure, duct and pressure parts erection, view from South |
| B01. Boiler rear side steel structure erection |
| B01. Boiler steel structure general view, from West |
| B01. Boiler steel structure erection, General view from West |
| B06. Bunker bay area Sole plate installation |
| B06. Bunker bay area Sole plate installation |
| B06. Bunker bay area steel structure and duct erection B63. Turbine hall Steel structure erection, view from East |
| B07. Fabric filter Hopper and Casing erection, view from West |
| B07. Farbic filter Casing erection, view from North |
| B17. Flue gas duct steel structure erection, Duct assembly & Erection |
| B17. Flue gas duct steel structure erection |
| B33. Unit electrical building 3rd floor slab concrete work 2nd floor plastering work |
| B33. Unit electrical building 1st floor HVAC duct erection |
| B33. Unit electrical building general view from East |
| B33.Unit electrical building general view from South |
| B35. Boiler electrical building painting, view from East |
| B35. Boiler electrical building ground floor cable tray erection |
| B35. Boiler electrical building ground floor general view |
| B35. Boiler electrical building 1st floor plastering work |
| B63. Tubine hall - veiw from West |
| B63. Turbine slab concrete work - South side |
| B63. Turbine hall rebar installation for slab view from South |
| B63. Turbine hall general view from, North |
| B63. Turbine hall civil conceretework, view from South |
| B63. Turbine hall general view from South, |
| B68. Auxiliary Transformer area - additional bore piling |
| B68. Main transformer area grating installation |
| C05. Crusher house2nd floor concrete work |
| C03. Fuel oil pump station foundation work |
| C30. Fuel oil unloading area |
| C30. Fuel oil unloading area |
| C40. Fuel oil storage tank, retention work |
| C71.Electrical building near Crusher house. |
| C72. Electrical building near bunker bay |
| D01. Ash stroage - structure erection, concrete pouring |
| E05. Cooling water piping sleeper foundation |
| E50. Cooling water culvert foundation work - Turbine hall to Aeration basin |
| F06. Cable way foundation |
| G05. Demin water proudction equipment erection |
| G06 - Demin effluent foundation - G05. Equipment ereciton |
| G08. Compressed air production |
| G17. Auxiliary Boiler foundation |
| G25. Operational inudstrial water pump station - steel structure erection, view from North |
| G25. Operation Industrial water pump station - 1st floor slab concrete, view from South |
| L05. FGD Duct foundation work |