ADV Module steel structure assemble

B01. Boiler presssure parts erection

B01. Boiler pressure parts erection, view from bottom

B01. Boiler pressure parts erection,
view from bottom

B06. Bunker bay area Silo duct, Steel structure erection,
B01. Boiler steel structure erection


B01. Pressure parts assembly

B01/B06 Steel structure erection, view from East



B01. Boiler steel structure, duct and pressure parts erection,
view from South


B01. Boiler rear side steel structure erection


B01. Boiler steel structure general view,
from West

B01. Boiler steel structure erection,
General view from West



B06. Bunker bay area  Sole plate installation

B06. Bunker bay area Sole plate installation

B06. Bunker bay area steel structure and duct erection
B63. Turbine hall Steel structure erection, view from East




B07. Fabric filter Hopper and Casing erection,
view from West

B07. Farbic filter Casing erection, view from North

B17. Flue gas duct steel structure erection,
Duct assembly & Erection

B17. Flue gas duct steel structure erection

B33. Unit electrical building 3rd floor slab concrete work
2nd floor plastering work

B33. Unit electrical building 1st floor HVAC duct erection


B33. Unit electrical building general view from East

B33.Unit electrical building general view from South


B35. Boiler electrical building painting, view from East

B35. Boiler electrical building ground floor cable tray erection

B35. Boiler electrical building ground floor general view

B35. Boiler electrical building 1st floor plastering work


B63. Tubine hall - veiw from West


B63. Turbine slab concrete work - South side

B63. Turbine hall rebar installation for slab
view from South





B63. Turbine hall general view from, North



B63. Turbine hall civil conceretework, view from South


B63. Turbine hall general view from South,

B68. Auxiliary Transformer area - additional bore piling

B68. Main transformer area grating installation

C05. Crusher house2nd floor concrete work

C03. Fuel oil pump station foundation work

C30. Fuel oil unloading area

C30. Fuel oil unloading area

C40. Fuel oil storage tank, retention work

C71.Electrical building near Crusher house.

C72. Electrical building near bunker bay


D01. Ash stroage - structure erection, concrete pouring

E05. Cooling water piping sleeper foundation

E50. Cooling water culvert foundation work -
Turbine hall to Aeration basin

F06. Cable way foundation


G05. Demin water proudction equipment erection 


G06 - Demin effluent foundation - G05. Equipment ereciton

G08. Compressed air production


G17. Auxiliary Boiler foundation


G25. Operational inudstrial water pump station -
steel structure erection, view from North

G25. Operation Industrial water pump station -
1st floor slab concrete, view from South


L05. FGD Duct  foundation work