| ADV Moduel Steel structure assembly |
| B01. Boiler pressure parts erection |
| B01. Steel structure erection, view from north side |
| B01. Boiler pressure parts erection, view from bottom |
| B01. Boiler pressure parts assembly at site |
| B01. Boiler steel structure & duct erection, view from North |
| B01. Boiler steel structure erection, view from South |
| B01. Boiler steel structure, duct & pressure parts erection, B07. Fabric filter hopper erection, view from South |
| B01. Boiler rear side steel structure erection |
| B06. Bunker bay structre erection preparation |
| B06. Bunker bay area steel plate erection |
| B06. Bunker bay steel structure and Silo duct erection |
| B07. Fabric filter hopper erection |
| B17. Flue gas duct preassembly |
| B17. Flue Gas Duct steel structure erectino |
| B33. Unit electrical building, general view, plastering work |
| B33. Unit electrical building ground floor, cable tray erection work |
| B33. Unit electrical building, ground floor cable tray erection work |
| B33. Unit electrical building 1st floor HVAC duct erection |
| B33. Unit electrical building general view from South |
| B35. Boiler Electrical building ground floor painting |
| B35. Boiler electrical building 1st floor HVAC duct erection |
| B63. Turbine hall view from South |
| B63. Turbine hall South side |
| B68. Auxiliary Transformer building |
| B68. Main Transformer building |
| C05. Crusher house 1st floor column erection |
| C72. Electrical building near bunker bay |
| C71. Electrical building near crusher house |
| D01. Ash storage structure work |
| E05. Cooling water piping sleeper foundation |
| E50. Cooling water culvert - Turbine hall to Aeration basin |
| F06. Cable way foundation |
| G05. Demineralized water production equipment erection |
| G06. Demineralized water production effluent |
| G08. Compressed air production foundation work |
| ADV Module steel structure assembly |
No comments:
Post a Comment
Note: only a member of this blog may post a comment.