ADV Moduel Steel structure assembly

B01. Boiler pressure parts erection

B01. Steel structure erection, view from north side


B01. Boiler pressure parts erection, view from bottom

B01. Boiler pressure parts assembly at site

B01. Boiler steel structure & duct erection, view from North

B01. Boiler steel structure erection, view from South


B01. Boiler steel structure, duct & pressure parts erection,
B07. Fabric filter hopper erection, view from South


B01. Boiler rear side steel structure erection

B06. Bunker bay structre erection preparation 

B06. Bunker bay area steel plate erection


B06. Bunker bay steel structure and Silo duct erection

B07. Fabric filter hopper erection

B17. Flue gas duct preassembly

B17. Flue Gas Duct steel structure erectino

B33. Unit electrical building, general view, plastering work

B33. Unit electrical building ground floor, cable tray erection work

B33. Unit electrical building, ground floor cable tray erection work

B33. Unit electrical building 1st floor HVAC duct erection

B33. Unit electrical building general view from South

B35. Boiler Electrical  building ground floor painting

B35. Boiler electrical building 1st floor HVAC duct erection

B63. Turbine hall view from South

B63. Turbine hall South side

B68. Auxiliary Transformer building

B68. Main Transformer building


C05. Crusher house 1st floor column erection

C72. Electrical building near bunker bay

C71. Electrical building near crusher house

D01. Ash storage structure work

E05. Cooling water piping sleeper foundation

E50. Cooling water culvert - Turbine hall to Aeration basin

F06. Cable way foundation

G05. Demineralized water production equipment erection

G06. Demineralized water production effluent

G08.  Compressed air production foundation work

ADV Module steel structure assembly