ADV Module steel structure assembly


B01. Boiler steel structure view from North

B01. Boiler pressure parts assembly


B01/B06. Boiler Steel structure, Bunker bay Steel
structure and Silo duct erection, view from East

B01. Boiler steel structure, pressure parts & Duct erection,
View from South


B01. Boiler pressure parts erection


B01. Boiler pressure parts
erection, view from Bottom

B01. Boiler pressure parts erection

B01. Boiler area piping erection

B01. Boiler rear side steel structure
and duct erection, view from South


B01. Boiler steel structure & pressure parts erection,
B07. Fabric filter hopper & Casing erection
B17. Flue gas duct assembly, view from West

B01. Boiler steel structure and D01. Ash Storage,
View from West

B17. Flue gas duct steel structure erection
and duct assembly


B06. Bunker bay area  erection

B06. Mill foundation area erection

B07. Fabric filter hopper & Casing erection, view from North



B07. Fabric filter Casing erection, view from West
  
B07. Fabric filter Hopper and Casing erection,
view from North


 
B33. Unit electrical building ground floor.
cable tray installation

B33. Unit electrical building 1st floor HVAC duct erection


B33. Unit electrical building Transformer area


B33. Unit electrical building, view from South

B35. Boiler electrical building, view from East

B35. Boiler electrical building ground floor,
cable tray erection

B35. Boiler electrical building ground floor general view

B35. Boiler electrical building 1st floor HVAC duct erection

B63. Turbine hall Steel structre erection
started on 14.04.2014

B63. Turbine hall steel rebar installation, view from East


B63. Turbine hall South side rebar installation

B63. Turbine hall Steel structure erection, view from North


B06. Bunker bay area steel structure & Silo duct erection
B63. Turbine hall Steel structure erection, view from East


B63. Turbine hall view from South side


B68. Auxiliary Transformer building area bore piling

B68. Main transformer building grating installation

B68. Main transformer building general view,
Grating installation



C03. Fuel oil pump station foundation work

C05. Crusher house 2nd floor slab concrete work

C30. Fuel oil unloading area


C72. Electrical building near bunker bay

C71. Electrical building near Crusher house

D01. Ash storage structure work

E05. Cooling water piping sleeper foundation work

G06. Demineralized water efffluent foundation


G05. Demineralized water production equipment erection

G08. Comperessed air production - foundationwork



G17. Auxiliary boiler foundation work


G25. Operational Industrial water pump station -
Steel structure erection, view from North

G25. Operational Industrial water pump station -
Steel structure erection and column erection,
view from South

G28. Oil & Fire Fighting water recovering pit - Piling work


L05. Absorber shell concrete work



L13. Aeration Basin concrete work


L05. Absorber shell, view from West

L24. FGD Duct foundation.


E50. Cooling water culvert foundation -
Turbine hall to Aeration Basin



F06. Cably Way foundation work