ADV Module assembly |
B01. Rear Side Steel structure erection |
B01. Boiler pressure parts erection, view from North |
B01. Pressure parts erection, view from North |
B01. Pressure parts erection, view from Bottom |
B01. Boiler steel structure erection , veiw from East |
B01. Boiler steel structure & duct erection, View from South |
B01. Boiler steel strcture & Pressure parts erection, B07. Fabric filter casing erection View from West |
B06. Bunker bay area sole plate installation |
B06. Bunker bay area sole plate installation |
B07. Fabric filter hopper casing erection, view from North |
B17. Flue gas duct assembly and erection, and steel structure erection |
B33. Unit electrical building ground floor cable tray installation |
B33. Unit electrical building transformer area, view from East |
B33. Unit electrical building view from South |
B35. Boiler electrical building, veiw from East, painting |
B35. Boiler electrical building, ground floor cable tray erection |
B35. Boiler electrical building First floor HVAC Duct work, and flooring |
B63. Turbine hall, Ground floor slab concrete & Piller work View from West |
B63. Turbine hall ground floor slab rebar installation |
B63. Turbine hall South side rebar installation |
B06. Bunker bay mill area sole plate installation |
B63. Turbine hall viewfrom North |
B63. Turbine hall steel structure erection, view from North |
B68. Auxiliary Transformer side concrete and bore piling |
b68. Main transformer building plastering and grating work |
B63. Turbine hall steel structure erection, view from East |
C72. Electrical building near bunker bay area |
D01. Ash storage structure concrete pouring |
E05. Cooling water piping sleeper foundation work |
E05. Demin. water proudction equipment erection |
G08. Compressed air production Foundation and column ereciton |
G25. Operational Industrial water pump station Steel structure erection |
G25. Operational industrial water pump station Building side plastering work |
L13. Aeration station basement slab concrete work |
L13. Aeration station piling work |
L13. Aeration basin slab concrete work |