| ADV Module steel structure assembly |
| B01. Boiler pressure part erection view |
| B01. Boiler pressure parts erection,view from bottom |
| B01. Boiler pressure parts erection view from bottom |
| B01. Boilere windbox duct erection, view from bottom |
| B01. Boiler duct erection erection, view from bottom |
| B63. Turbine hall side wall and pedestal concrete |
| B01. Boiler steel structure and duct erection view from North |
| B01. Boiler pressure parts assembly at site |
| B01. Boiler steel structure erection , view from South ADV Module steel structure erection |
| B01. Boiler steel structure, duct and pressure parts erection, view from South |
| B01. Boiler rear side steel structure and duct erection, view from South |
| B01. Boiler steel structure and Pressure parts erection, view from West B07. Fabric filter steel structure and hopper erection |
| B01. Boiler steel structure erection, view from West |
| B01. Boiler steel structure and B07. Fabric filter hopper erection,, view from West |
| B06. Bunker bay area steel structure erection preparation |
| B06. Bunker bay area steel plate erection |
| B06. Bunker bay area steel structure installation |
| B06. Bunker bay area steel structure and Silo duct erection |
| B07. Fabric filter hopper erection, view from South |
| B07. Fabric filter Hopper erection, view from West B01. Boiler steel structure erection view from West |
| G17. Auxiliary boiler foundation work |
| B17. Flue gas duct assembly |
| B17. Flue gas duct steel structure column erection |
| B33. Unit electrical building 1st floor HVAC Duct erection |
| B33. Unit electrical building general view from North, 3rd floor column erection |
| B33. Unit electrical building ground floor Cable tray erection |
| B33. Unit electrical building 1st floor HVAC Duct erection |
| B33. Unit electrical building transformer building area, view from East |
| B33. Unit electrical building general view from South |
| B35. Boiler electrical building general view from East Plastering and painting |
| B35. Boiler electrical building 1st floor plastering and painting work |
| B35. Boiler electrical building 1st floor HVAC work |
| B35. Boiler electrical building transformer area |
| B63. Turbine hall side wall concrete and pedestal, South end |
| B63. Turbine hall side wall and pedestal, view from South |
| B63. Trurbine hall middle area side wll concrete and pedestal |
| B63. Turbine hall general view from North |
| B63. Turbine hall general view from North Slabe concrete reform work |
| B63. Turbine hall slab concrete reform work |
| B68. Auxiliary transformer side concrete work |
| B68. Main transformer building |
| C03. Fuel Oil Pump station |
| C05. Crusher house building 1st floor column erection |
| C30. Fuel oil unloading area |
| C30. Fuel oil unloading area |
| C71. Electrical building near Crusher house |
| C72. Electrical building near Bunker Bay |
| D01. Ash stroage structure foundation |
| E05. Cooling water piping sleeper foundation |
| E50. Cooling water culvert Turbine hall to Aeration basin |
| F06. Cable way foundation transformer to switchyard |
| G05. Demineralized water production equipment erection |
| G05. Demineralized water production equipment erection |
| G06. Demineralized water effluent |
| G08. Compressed air production building foundation |
| G25. Operation industrial water production foundation and structure column erection at North end |
| G25. Operational industrial water production foundation and column erection, South side |
| L05. Absober shell side wall rebar installation, view from South |
| L05. Absorber shell side concrete reform work, view from North |
| L24. FGd Duct foundation work |