ADV Module steel structure assembly

B01. Boiler pressure part erection view


B01. Boiler pressure parts erection,view from bottom


B01. Boiler pressure parts erection view from bottom

B01. Boilere windbox duct erection, view from bottom



B01. Boiler duct erection erection, view from bottom

B63. Turbine hall side wall and pedestal concrete

B01. Boiler steel structure and duct erection view from North


B01. Boiler pressure parts assembly at site

B01. Boiler steel structure erection , view from South
ADV Module steel structure erection


B01. Boiler steel structure, duct and pressure parts erection,
view from South

B01. Boiler rear side steel structure and duct erection,
view from South

B01. Boiler steel structure and Pressure parts erection,
view from West
B07. Fabric filter steel structure and hopper erection

B01. Boiler steel structure erection, view from West


B01. Boiler steel structure and B07. Fabric filter  hopper erection,,
view from West


B06. Bunker bay area steel structure erection preparation

B06. Bunker bay area steel plate erection

B06. Bunker bay area steel structure installation

B06. Bunker bay area  steel structure and Silo duct erection

B07. Fabric filter hopper erection, view from South


B07. Fabric filter Hopper erection, view from West
B01. Boiler steel structure erection view from West

G17. Auxiliary boiler foundation work

B17. Flue gas duct assembly

B17. Flue gas duct steel structure column erection

B33. Unit electrical building 1st floor HVAC Duct erection

B33. Unit electrical building general view from North,
3rd floor column erection


B33. Unit electrical  building ground floor Cable tray erection

B33. Unit electrical building 1st floor HVAC Duct erection

B33. Unit electrical building transformer building area,
view from East

B33. Unit electrical building general view from South

B35. Boiler electrical building general view from East
Plastering and painting

B35. Boiler electrical building 1st floor
plastering and painting work

B35. Boiler electrical building 1st floor HVAC work

B35. Boiler electrical building transformer area


B63. Turbine hall side wall concrete and pedestal, South end

B63. Turbine hall side wall and pedestal, view from South


B63. Trurbine hall middle area side wll concrete and pedestal

B63. Turbine hall general view from North

B63. Turbine hall general view from North
Slabe concrete reform work

B63. Turbine hall slab concrete reform work



B68. Auxiliary transformer side concrete work

B68. Main transformer building


C03. Fuel Oil Pump station



C05. Crusher house building 1st floor column erection

C30. Fuel oil unloading area


C30. Fuel oil unloading area

C71. Electrical building near Crusher house

C72. Electrical building near Bunker Bay

D01. Ash stroage structure foundation

E05. Cooling water piping sleeper foundation


E50. Cooling water culvert Turbine hall to Aeration basin


F06. Cable way foundation transformer to switchyard

G05. Demineralized water production equipment erection

G05. Demineralized water production equipment erection

G06. Demineralized water effluent


G08. Compressed air production building foundation


G25. Operation industrial water production foundation
and structure column erection at North end



G25. Operational industrial water production foundation
and column erection, South side

L05. Absober shell side wall rebar installation, view from South

L05. Absorber shell side concrete reform work, view from North

L24. FGd Duct foundation work