B01. Boiler pressure parts assembly at site
L13. Aeration Basin and
Under ground GRP piping sheet piling
L05. Absorber Side wall reform work and
Under ground GRP pipe sheet piling
G25. Operational industrial water pump station
G10. Emergency Diesel Generator foundation
G17. Auxiliary Boiler foundation work
G06. Demineralized water effluents
E05. Cooling water piping sleeper foundation
C72. Electric building near bunker bay
D01. Ash storage foundation work
C71. Electrical building
near crusher house 2nd floor Slab concrete
C05. Crusher house foundation
and column erection
C40. Light fuel oil storage retention work
B68. Main transfor building plastering work
B63. Turbine hall
basement rebar installation on North side
B35. Boiler electrical building
auxiliary transformer area
B33. Unit electrical building, view from East
B33. Unit electrical building
1st floor plastering work
B07. Fabric filter steel structure erection,
view from West
B07. Fabric filter steel structure erection,
view from South
B06. Bunker bay area steel structure,
piping and silo duct erection. view from East
B01. Boiler steel structure area
lifting equipment erection, view from West
B01. Boiler Steel structure erection,
view from South