B01. Boiler steel structure,
pressure parts & duct erection
General view from West
B01. Steel structure tier 6&7 and Duct erection
view from South
B06. Bunker bay area steel structure
and Silo duct erection, view from East
B01. Pressure parts assembly at site
B01. Boiler area lifting equipment erection
B02. Chimney erection,
concrete pouring in progress
D01. Ash storage foundation work
B07. Fabric Filter area Steel structure erection
B33. Unit Electrical building,
2nd floor column erection
B33. Unit electrical building transformer area
B35. Boiler electrical building
and Auxiliary transformer area
B63. Turbine hall basement concrete work,
View from North
B68. Main transformer building
C05. Crusher house foundation column erection
C03. Fuel oil pump station
C71. Electrical building near crusher house
C72. Electrical building near bunker bay
E05. Cooling water piping sleeper foundation
G05.Demineralized water production
Foundation and column erection
G06. Demineralized water effluent foundation
G18. Reserve feed water storage
G17. Auxiliary boiler foundation work
G25. Operation industrial water pump station
foundation work
L05. Absorber wall erection,
sheet piling for GRP pipe
L13. Aeration basin area
sheet piling for GRP pipe
Coal yard - Stack reclaimer A area
Stack reclaimer B - rail installation
Coal handling Transfer tower TT16
Steel structure erection
TT17 - Steel structure erection
TT18 - Foundation work
TT19 - Foundation work
TT20. Steel structure erection
TT21 - Steel structure erection
TT22 - Foundation work
TT23 - Foundaiton
TT24 - Foundation
C08. Coal handling electrical building area