Wednesday, 29 January 2014

29.01.2014



B01. Boiler pressure parts assembly at site


B01. Boiler steel structure Tier 6 & 7
and duct erection, South side

B07. Fabric filter steel structure and
B01. Steel structure & Pressure parts erection


B02. Chimney pouring concrete

B02 Chimney erection

B06. Bunker bay area silo duct & steel erection

B07. Fabric filter steel structure erection


B07. Fabric filter casing assembly at site

D01. Ash storage foundation work

B33. Unit electrical building
3rd floor slab concreting work


B33. Unit electrical building transformer area

B35. Electrical building

B35. Boiler electrical building transformer area

B63. Turbine hall basement 
Strip 3a, 4a concrete pouring completed




B68. Main transformer building
concrete repair work

C03. Fuel oil pump station
foundation excavation

C30. Fuel oil unloading area

C40. Light fuel oil storage retention work

C72. Electrical building near Crusher house

C72. Electrical building near bunker bay

F06. Cable bay area


G05. Foundation

G05. Equipment at site

G06. Foundation rebar installation

G17. Auxiliary boiler foundation

G25. Foundation work

L05. Absorber shell concrete work

C05. Crusher house column erection

L13. Aeration basin area sheet piling for GRP pipe

L13. Aeration basin area pile cap preparation