B01. Pressure parts assembly at site
B01. Pressure parts item preparation for lift
B01. Pressure parts erection, view from bottom
B07. Farbic filter steel structure and B01.
Boiler steel structure erection
B01. Boiler area piping erection
B01. Boiler steel structure Tier 6 & 7, and
Silo duct erection, view from South
B06. Bunker bay area structure erection
B06. Bunker bay area steel structure
and silo duct erection
B33. Unit electrical buiding,
3rd floor slab concrete wor
B33. Unit electrical building
1st floor plastering work
B33. Unit electrical building
auxi. tranformer area
B07. Fabric Filter steel structure erection
B07. Hopper and Casing assembly
B63. Turbine basement concreting work
B68. Auxiliary transformer area
B68. Main transformer building
concrete repair work
C05. Crusher house column erection
C30. Fuel oil unloading area excavation
C71. Electrical building near crusher house
C72. Electrical building near Bunker bay
D01. Ash storage foundation work
F06. Cable bay area
G05. Demineralized water production foundation
G06. Demineralized water effluents foundation
work
G17. Auxiliary boiler foundation
G18. Reserve feed water storage
G25. Operational industrial water pump station
foundation
B35. Boiler electrical building
2nd floor column erection
L05. Absorber shell concrete work
Cold reheat piping erection