B01. Boiler pressure parts assembly at site
B01. Steel structure & Silo duct erection,
View from South
B01. Boiler steel structure erection, view from North
B06. Bunker bay area
B06. Bunker bay area view from East
B07. Fabric filter area steel structure erection
B07. Fabric filter steel structure erection,
view from West
B33. Unit electrical building
1st floor plastering work
B33. Unit electrical building view from North
B35. Boiler electrical building, view from East
B63. Turbine hall basement slab concreting work,
view South side
B63. Turbine hall basement concrete work,
View North side
B68 .Main transformer building, plastering work
C05. Crusher house column erection
C40. Light fuel oil storage retention work
C71. Electrical building near crusher house
C72. Electrical building near bunker bay
D01. Ash storage foundation
E05. Cooling water piping sleeper foundation
G05. Demineralized water production foundation,
G05 - Equipment at site for erection
G25. Operational industrtial water pump station
E02. Cooling water Pumpstation
B07. Fabric filter steel structure erection
M07. Cooling water outfall concreting work
F01. Switchyarde Gantry erection