Monday, 20 January 2014

20.01.2014


B01. Boiler pressure parts assembly at site

B01. Steel structure & Silo duct erection,
View from South

B01. Boiler steel structure erection, view from North 

B06. Bunker bay area

B06. Bunker bay area view from East

B07. Fabric filter area steel structure erection

B07. Fabric filter steel structure erection,
view from West

B33. Unit electrical building
1st floor plastering work

B33. Unit electrical building view from North

B35. Boiler electrical building, view from East

B63. Turbine hall basement slab concreting work,
view South side



B63. Turbine hall basement concrete work,
View North side

B68 .Main transformer building, plastering work


C05. Crusher house column erection

C40. Light fuel oil storage retention work

C71. Electrical building near crusher house

C72. Electrical building near bunker bay

D01. Ash storage foundation

E05. Cooling water piping sleeper foundation

G05. Demineralized water production foundation,

G05 - Equipment at site for erection


G25. Operational industrtial water pump station

E02. Cooling water Pumpstation






B07. Fabric filter steel structure erection

M07. Cooling water outfall concreting work


F01. Switchyarde Gantry erection
 

No comments:

Post a Comment

Note: only a member of this blog may post a comment.