Sunday, 26 January 2014

27.01.2014




Coal Handling Transfer Tower TT16
Steel structure erection

TT17. Steel structure erection

TT18. Foundation work

TT19. Foundation work

TT20. Transfertower foundation

TT21. Steel structure erection

TT20. Foundation work

 
B01. Boiler steels structure
B07.  Fabric Filter steel structure erection

B07. Fabric filter steel structure erection,
view from West

B01. Steel structure & Silo duct erection,
view from South

B06. Bunker Bay steel structure and
Silo duct erection, view from East

B07. Fabric filter Steel structure erection,
view from North

B07. Fabric filter Steel structure erection,
view from West

B07. Fabric filter Hopper and Casing assembly

G17. Auxiliary Boiler Foundation work

B33. Unit electrical building
3rd floor slab work, view from south

B35. Boiler electrical building
auxiliary transformer area

B35. Boiler electrical building
2nd floor column erection

B63. Preparation for Concrete pouring
basement of Turbine Hall



C05. Crusher house column erection

C30. Fuel oil unloading area
pile cap preparatoin

C40. Light fuel oil storage area

C71. Electrical building near Crusher house

C72. Electrical building near Bunker Bay

D01. Ash storage foundation work

L05. Absorber shell - side wall rebar installation,
And Sheet pile for GRP pipe


L13 - Aeration basin area
sheet piling for GRP pipe

L13. Aeration basin pile cap preparation