Coal Handling Transfer Tower TT16
Steel structure erection
TT17. Steel structure erection
TT18. Foundation work
TT19. Foundation work
TT20. Transfertower foundation
TT21. Steel structure erection
TT20. Foundation work
B01. Boiler steels structure
B07. Fabric Filter steel structure erection
B07. Fabric filter steel structure erection,
view from West
B01. Steel structure & Silo duct erection,
view from South
B06. Bunker Bay steel structure and
Silo duct erection, view from East
B07. Fabric filter Steel structure erection,
view from North
B07. Fabric filter Steel structure erection,
view from West
B07. Fabric filter Hopper and Casing assembly
G17. Auxiliary Boiler Foundation work
B33. Unit electrical building
3rd floor slab work, view from south
B35. Boiler electrical building
auxiliary transformer area
B35. Boiler electrical building
2nd floor column erection
B63. Preparation for Concrete pouring
basement of Turbine Hall
C05. Crusher house column erection
C30. Fuel oil unloading area
pile cap preparatoin
C40. Light fuel oil storage area
C71. Electrical building near Crusher house
C72. Electrical building near Bunker Bay
D01. Ash storage foundation work
L05. Absorber shell - side wall rebar installation,
And Sheet pile for GRP pipe
L13 - Aeration basin area
sheet piling for GRP pipe
L13. Aeration basin pile cap preparation