Thursday 31 October 2013

31.10.13

B01. Boiler steel structure Tier 3 & 4,
Duct erection, view from West


B01/B06. Steel structure, Grating,
Cool & Hot air duct and Silo Cone erection
 in progress - general view from north

B01/B06. Steel structure, Grating,
Cool & Hot air duct and Silo Cone erection
 in progress - general view from South


Grating installation


B06. Bunker Bay area steel structure
Tier 4 erection & Silo Cone erection


B02. Chimney Erection in progress


B10 ID Fan area

B33. Unit Electrical building
First floor roof concrete work
                                          


B35. Boiler electrical building Ground floor
roof slab concreting work
                                            
                                            B35. Boiler electrical building area
                                                     Auxiliary Transformer foundation
                                         
                             
                                             B63. Turbine Hall civil work -
                                                     excavation in progress

                                           
                                            B68. Main Transformer Building
                                                     side wall concrete work

                                             E50. Cooling water culvert work in progress

Wednesday 30 October 2013

29.10.13 Aerial Photograph - October 13

Power Block General view from East

B33. Unit Electrical Building first floor roof slab concreting
B68. Transformer/ Auxiliary Transformer building
B63. Turbine Hall civil work,
B01/B06 Steel structure Tier 3 & 4 erection
Boiler Hot & Cool Air duct erection
B06. Bunker bay steel structure and
Silo cone erection & grating

Power block East side area, G05/06 Water
treatment plan, and Tank foundation,
view from East

E05. Cooling water piping sleeper,
(Some Pipe delivered at site)

                                             F01. Switch yard Gantry erection,
                                                     Trench & Foundation in progress

Power Block general view from West
B01. Steel strcuture Tier #3 & 4 erection in progress
Hot & Cool Air Duct erection in progress,
B06. Bunkery bay area steel structure and
Cool air duct, silo cone erection in progress,
B35. Ground floor slab concrete work
B10 ID fans foundation. B02 Chimney
windshield concrete work, L05 Absorber
Shell, B17 flue gas duct erection
L10. Booster Fan pedestal installation
C05. Crusher house foundation

Coal Handling Transtower Steel structure erection

E02. Cooling water Pump Station
General view

C04. Coal Yard & Stack reclaimer erec


                                                                          Material Laydown area








Monday 28 October 2013

28.10.13

B01. Steel structure & Duct erection
General view from West

B06. Bunker area steel structure and Silo erection
General view from East
                                                
                                              B01. Steel structure & Hot air Duct erection
                                                view from North

B01. Steel structure Tier 3 & 4 erection,
Hot Air duct erection, B06. Bunker bay steel erection
Tier 3 & 4 and Silo Cone erection,
general view from South
                                                              Grating erection


                                            B02. Chimeny erection, Windshield slide
                                                     concrete pouring in progress
                      
                                             B33. Unit Electrical building,
                                                     concrete rebar installation


                                           B33. Unit electrical building first floor
                                                    roof Slab concreting,

                                           B35. Boiler Electrical building roof slab concreting
                                           
                                           B35. Boiler electrical building - Auxiliary
                                                    transformer foundation/Pedestal work
                         
                                            B63. Turbain Hall civil work

                                            B63. Turbin Hall - excavation  


B68. Transformer Building
side wall concreting work
                                            B68. Transformer building concreting work,
                                                      view from South
                                            C07 TT23 - Transfer Tower foundation
                                                                 concrete reforming work
                                           C71. Electrical building near Crusher house,
                                                      piller rebar installation
                                           C05. Crusher house foundation work
                                           
                                          G06. Water production plant foundation work


                                         B07. Fabric Filter pile replacement
                                                  work in progress
                                             L05. Absorber foundation - back filling
                                             L13. Aeration basin area sheet file installation
                                             L10. Booster Fan pedestal concrete reform work