Tuesday 30 July 2013

30.07.2013


B01. Boiler Foundation area -
 Crane at site for erection, view from North

B01. Boiler Foundation area -
 Crane at site for erection, view from West


                                           B01. Boiler -  Pedestal foundation finishing work
                                                                   view from East

                                          B01. Boiler foundation pedestal area finishing work-
                                                view South

                                               
                                           
                                           B01 - Boiler foundation area backfilling and leveling
                                                     view from East

                                           B01 - Boiler foundation area backfilling and leveling
                                                     view from South


                                           B01 - Boiler foundation area backfilling and leveling
                                                     view from South

   B01 - Boiler foundation  and Bunker area backfilling
and leveling view from South

B06 - Bunker bay area view from North - concrete
                                                     reinforcement work                                           

B06. Bunker bay - concrete reinforcement work
view from North

B02 - Chimney - Foundation completed
                                              
                                           B10 - ID Fan - South pile cap preparation

B07 - Fabric Filter - Pile cap preparation

                                           B33 - Unit electrical building - ground floor work
                                           
                                            B35 - Boiler Electrical Building
                                                   - Tie beam concrete work


                                             B63. Turbine Hall - Piling work on North side

B63. Turbine Hall - Piling work on west side


D01. Ash Storage - Bore piling 

D01. Ash Storage - Bore piling

E50. Cooling Water Culvert - Piling work


                                            L05 - Absorber Pile Cap preparation


                                           L10. Boosster Fan concrete reinforcement work

L24.FGD Duct foundation - pile cap preparation

Sunday 28 July 2013

29.07.2013




B06, Bunker Bay concrete and rebar installation
- view from south


                                           B06. Bunker Bay - rebar installation &
                                                    concrete North side - view from North

                                           B06. Bunker Bay concrete North side
                                            - View from North

B01. Boiler foundation finishing work on pedestal

B01. Boiler foundation finishing work on pedestal


B01. Boiler Steel Structure foundation area
- view from west


B01. Boiler Foundation FD fan area finishing work





                                             B01. Boiler area Erection crain at site.


                                    B02. Chimney foundation completed & Erection started

B07. Fabric Filter Pile cap preparation

                                            B63. Turbine Hall North side - Piling erection,
                                                     view from west


                                        
                                            B63. Turbine Hall - piling erection South side
                                                     View from North

B63. Turbine Hall view from South side

B33. Electrical Building - concrete form work
 Ground floor

B68. Transformer Concrete work - view from North

B68. Transformer - concrete inforcement work


                                                             D01. Ash Storage -
                                                                    Bore piling work

L05. Absorber - Pile cap & Lean concrete work


L10. Booster fan foundation reinforcement work

L24. FGD duct foundation work

Friday 26 July 2013

26.07.2013

                                B01 - Boiler Steel structure foudation - finishing work

B01 - Boiler foundation strengthning work -
backfilling finishing work, view from South

                                               B01. Boiler Area 
                                               720 Ton Crane at site

B01. Boiler Foundation - Backfilling
                                                 view from South


                                               
                                 B06. Bunker Bay Concrete - view from North


                                B06. Bunker bay concrete work - view from South


B06. Bunker bay concrete work - vew from South

                                B01. Boiler foundation area - backfilling

  
B10. ID fan South - Pile cape preparation

B07. Fabric Filter - Pile cap preparation

B33. Unit Electrical Building - Ground floor work

B33. Boiler Electrical building
Tie bar concrete work

B63. Turbine Hall - Piling work North end
View from West


B63. Turbine Hall - Piling work view from North 

B63. Turbine Hall North side piling woork
View from south

B68. Transformer - Concrete

C06 - Cool conveyor between C05 & C07
Concrete

C06 - Cool conveyor between C05 & C07
TT23 - foundation backfill 


                                B02 - Chimney -  Erection
                                



                                 E50. Cooling Water Culverts - Piling work

E50. Cooling Water Culverts - Piling work

                         
                                 L05. Absorber - Pile cap preparation



                                L10. Booster fan foundation - reinforcement work


                                L13. Aeration Basin - Piling work

L24. FGD Duction foundation - Pile cap preparation