Tuesday 30 September 2014

30.09.2014 - Power block

Boiler area general view from North
Entrance of site

B01. Boiler  cool and air duct, and preheater erection

B01. Boiler furnace wall assembly





B01. Boiler furnance wall for erection


B63. Turbine hall area large bore pipe erection

B01. Boiler steel structure,& hot and cool air duct erection

B01. Boiler duct erection, view from South

B01. Boiler area general view from South

B02. Chimeny Flue Gas container erection

B02. Chimeny lining application

B06. Bunker area Pulveriser erection, view from North


B06. Pulverizer erection, view from South


B07. Fabric filter casing  erection, view from north

B07. Fabric filter casing erection, view from West

B17. Flue gas duct and steel structure erection, view from South

B17. Fabric filter steel structure and duct erection

B35. Boiler electrical building, cable pulling

B33. Unit electrical building cable pulling

B33. Unit electrical building painting



B33. First floor panel erection

B33. !st floor LV panel erection

B33. Unit electrical building control room area

B33. Unit electrical building roof area,, HVAC work

B33. Feed water pump alignment

b35. Boiler electrical building

B35. Cable puling

B63. Turbine hall Cooling water outlet piping area




B63. Large bore piping

B63. Large  bore piping

B63. Turbine hall view from North

B63. Turbine hall area North side civil work

B63. Turbine hall general view from North


B63. Turbine hall lvl 16

B63. Turbine hall condenser neck

B63. Cooling water outlet piping area


B06. Pulverizer erection

B63. Turbine hall general view from South

B68. Auxiliary transformer



B68. Main transformer erection

C03_30 Light fuel oil pump station area


C05. Crusher house civil work

L40. Light fuel oil stroage tank erection


D01. Ash storage tank erection

E05. Cooling water under ground piping saddel foundation

E05. Under ground cooling water piping installation

E50. Turbine hall to Aeration basin outfall foundation work

HV cable steel support installation


G02 Raw water supply storage tank erection

G05. Demin plant erection

G07. Demin storage tank erection

G08. Air compressed building





G16. Waiste water treatment plant

G17. Auxiliary boiler heater erection


G17. Auxilary boiler erection

G20. Potable water stroage tank erection

G25. pump station erection

G25. Water pump station and G02 tank erection

G08. Recovery pit

Ho3 Pipe rack erection

H03 pipe rack erection

L10. Booster fan area erection

L10. Booster fan area


L13. GRP Piping erection

L43. Absorber discharge and supply pipe foundation