Sunday 30 November 2014

30.11.2014 - Power Block Area


Plant general view from East

 

B01. Air preheater erection

B01. Air preheater erection

Boiler windbox area duct erection

B01. Boiler ereciton

B02. Pulverize & Piping erection

B01. Boiler erection generation view from Southh


B01. Boiler Cool and Hot duct erection



B06. Bunker bay area pulveriser erection

B06. Pulverizer erection, view from South



B07. Fabric filter casing erection, view from  South


B10. ID fan erection

B17. Flue gas duct erection


L10. Booster fan area duct and steel structure erection
& B17 Flue gas duct erection


B33. Unit electrical building, 3rd floor


B33. Unit electrical building I&C cable termination

G05. Demin plant and H03 Pipe rack erection

B33. Unit electrical building roof area - HVAC work


B33. Ground floor cable pulling

B33. Auxilary transfomer area cable pulling & termination

B35. Boiler electrical building panel area -
cable pulling and termination


B63. Turbine hall - -05 level piping installation

B63. Polish plant area


B63. Turbine hall - large bore piping erection

B63. Turbine hall general view from North




B63. Excitation transformer and Bus bar(IPB) erection

B63. CCCW pump and large bore pipe erection


B63. Condenser model on position

B63. -0.5 level - booster pump and piping erection

B63.-0.5 Polish plant equipment erection


B63. Turbine hall general view from East

B33. LV panel cable termination


B33. LV Panel back energize for battery charge



B63. Turbine hall general view from East- equipment erection



B63. Turbine hall general veiw from South





B68. Main transformer erection

B68. Auxiliary transformer IPB erection

C30. Fuel oil unloading area

C40. Fuel oil storage tank erection


E05. Cooling water underground pipe erection

E50. Outfall from Turbine hall to Areation basine

HV cable pulling

G02 raw water storage tank erection



G05. Demin plant equipment erection

G07. Potable storage tank erection

G08. Air compressor building




G17. Auxiliary Boiler erection


Add caption


G25. Water pump station pump erection

G25. Water pump station





L05. Absorber

L10. Booster fan. duct and steel structure erection

L13 Areation basin



L41. Absorber Supply and discharge pipe erection