Wednesday 26 February 2014

26.02.2014 - Aerial Photo graph February


  

Aerial Photo Graph - February 2014
Plant overall veiw from East

Power block view from East
B33. Unit Electrical building, B63. Turbine hall.
B68. Main/Auxiliary Transformer Building
B01. Steel structure,
B06. Bunker bay area silo duct erection,
G17. Auxiliary boiler foundation, G18. Reserve feed water foundation

Power block East Side
F06. Cable way foundation Transfermer to Switchyard,
E05. Cooling water piping sleeper foundation
G28. Oil & Fire fighting water recovery pit

G02. Raw water storage
G07. Demineralized water storage.
G05. Demineralized water production
G06. Demineralized water effluents
G25. Operational industrial water pump station

B01. Boiler pressure parts assembly area and Tank area

E05. Cooling water piping sleeper foundation

Power Block general view from West
B01. Boiler steel structure, pressure parts & duct erection
D01. Ash storage foundation work,
B07. Fabric filter steel structure erection
B10. ID Fan foundation, B35. Boiler electrical building
C05. Crusher house, C71. Electrical building.
L05. Absorber - side wall rebar installation. L10 Booster fan foundation,.
L13. Aeration Basin foundation.
L43. Absorber supply and discharge GRP piping - sheet piling
C40. Light fuel oil storage retention work


L13 Aeration basin foundation

Aeration basin foundation
Material Lay down area
Switchyard
E50. Outfall cultvert. C73. Electrical building,
Tranfering Tower TT16 & 17
C04 Coal yard,
Transfer tower TT20 & 21
Coal Yard Stack reclaimer area

E02. Cooling pump station & Intake area
E07. Cooling water electrical building
Material laydown area
Material laydown area

New lay down area

New laydown area

Tuesday 25 February 2014

25.02.2014 (Hopper erection started on 24.02.2014)



B07. Fabric Filter Hopper - erection started on 24 Feb 2014

B01. Boiler steel structure, Pressure Parts & duct erection,
View from South


B06. Bunker bay area steel structure & silo duct erection
View from East

B01. Boiler Pressure parts erection.
B07. Steel structure erection & Hopper installation

B01. Piping erection
B06. Bunker bay area Mill foundation



B07. Fabric Filter Casing assembly

B07. Fabric Filter steel structure & Hopper erection 


B07. Fabric filter casing assembly (Flue gas foundation area)


B07. Fabric filter steel structure - view from South


B33. Unit Electrical building, view from South

B33. Unit electrical building Transformer area,
view from East

B33. Unit electrical building ground floor HVAC erection

B33. Unit electrical building gound floor exhaust Fan installation

B33. Unit electrical building ground floor
HVAC  duct frame installation


B35. Boiler electrical building

B35. Boiler Electrical building ground floor,
plastering, painting & HVAC erection work
B35. Boiler electrical building 1st floor -
plastering, painting & HVAC erection work



B63. Turbine hall - general view from North


B63. Turbine hall General view from North


B68. Auxiliary Transformer building area
side wall rebar installation

B68. Main transformer building - concrete repair work



C03. Fuel oil pump station - pile cap preparation


C05. Crusher house - 1st floor concrete slab


C40. Light fuel oil storage  retention work


C71. Electrical building near Crusher house

C72. Electrical building near Bunker bay area



D01. Ash storage foundation rebar installation


E05. Cooling water piping sleeper foundation piling extension

E50 Cooling water culvert - sheet piling

F06. Cable way foundation

G05. Demineralized water production equipment erection


G06. Demineralized water effluents foundation work


G17. Auxiliary boiler foundation work

G18. Reserve feed water storage foundation - rebar installation



G25. Operational industrial water pump station foundation work

G28. Oil & fire fighting water recovery pit - sheet piling




L05. Absorber side wall rebar installation


L05. Aeriation basin foundation work