30.03.2014 - Aerial Photographs March 2014






Aerial Photographs
Overal Plant General view from East
   
Power Block area - General view from East

Power block East Area - Tanks area
G02. Raw water storage, G05. Demineralized water production.
G07. Demin water storage. G25. Operational industrial water pump station.
F06. Cable way foundation
 
F01. Switch Yard - Gandry erection, view from East


E05. Cooling water piping sleeper foundation area and Intake

Power block view from West.
C05. Crusher house,  C72. electrical building,  B02. chimeny,
L05. Absorber area, D01. Ash storage.
B07. fabric filter area hopper erection
B35. Boiler electrical building. L13 Aeration basin

Power Block general view from West.
B01. Boiler steel structure, Duct and Pressure parts erection

Coal Handly System conveyor foundation
and steel structure erection

Power block- D01. Ash storage structure erection.
B07. Fabric filter hopper erectoin. B35. Boiler electrical building
B17. Flue gas duct assembly and steel structure erection

C04. Coal yard South side. Stack reclaimer foundation work,

Coal handling system transfer tower TT17 & 16,
C73. Electrical building, E50. Cooling water culvert

C04. Coal yard South side. steel structure for coal conveyor

C04. Coal yard North area. TT20 & 21 steel structure

Power plant overall veiw from North


E02. Cooling water pump station and Intake,
and electrical building

E02. Cooling water pump station

Friday 28 March 2014

28.03.2014

B01. Boiler steels erection, view from North


B01. Boiler pressure parts assembly at site.
 

B01. Boiler steel structure and duct erection,
view from South

B01. Boiler steel structure, Duct and
pressure parts erection, view from South

B01. Boiler steel structure at rear side

B01. Boiler steel and pressure parts erection,
B07. Fabric filter hopper erection, view from West

B01. Boiler steel and pressure parts erection,
B07. Fabric filter hopper erection, view from West


B01. Boiler steel structure and
B02. Fabric filter hopper erection, general view from West


B01. Boiler pressure parts item lifting position fit up


B06. Bunker bay area mill foundation complete
and start erection activity

B06. Bunker bay area steel structure and Silo duct erection

B07. Fabric filter steel structure and hopper erection, view from
North

B07. Fabric filter hopper erection view from South

B01. G17 Auxiliary boiler foundation &
C40. Light fuel oil storage retention work

B17. Flue gas duct assembly and steel structure erection


B17. Flue gas duct steel structure erection 


B33. Unit electrical building ground floor HVAC erection


B33. Unit electrical building 1st floor HVAC erection work


B33. Unit electrical building 3rd floor column erection,
view from East

B33. Unit electrical building general view from South

B35. Boiler electrical building plastering and painting,
view from East

B35. Boiler electrical building groud floor  painting


B35. Boiler electrical building 1st floor HVAC work

B35. Boiler electrical building transformer building area,
view from West

B63. Turbine hall west side wall, view from North

B63. Turbine hall side wall, view from North


B63. Turbine hall wall concrete South end

B63. Turbine hall side concrete wall - west side,
view from South


B63. Turbine hall concrete pedestal, view from North

B63. Turbine hall rebar install for concrete slab 0 level
view from North




B63. Turbine hall rebar installation for slab concrete


B68. Auxiliary transformer building side rebar installation


B68. Main transformer building

B68. Main transformer building

C03. Fuel Oil Pump station foundation work

C05. Crusher House 1st floor column erection

C30. Fuel oil unloading area foundation work



C40. Light fuel oil storage retention work

C72. Electrical building near Crusher house



C72. Electrical building near Bunker bay area

D01.Ash storage structure erection

E05. Cooling water piping sleeper foundation work


E50. Cooling water culvert foundation
Turbine hall to Aeration Basin
  
F06. Cable way foundation
Main transformer building to Switchyard

G05. Demineralized water production equipment erection





G25. Operational industrial water pump station foundation
 and column erection, view from North


G06. Demineralized water effluent


G16. Industrial waste water treatment area

G25. Operation Industrial water pump station column
erection, view from South

G18. Reserve feedwater storage





G28. Oil & Fire fighting water recover pit


L05. Absorber shell side wall rebar installation

L13. Aeration basin foundation and side wall concrete work


L24. FGD Duct foundation work