Monday, 12 August 2013

13.08.2013


B01. Boiler Steel structure erection,
view from North

B01. Boiler Steel structure erection,
view from South

B01. Boiler Steel Structure eredtion,
view from East

B02. Chimeny - Slip ring erection

B06. Bunker Bay, view from South

B06. Bunker Bay remaining work
-  view from North

B10. ID Fan Foundation - Pile cap preperation


B33. Unit electrical building ground floor work


B63. Turbine building - civil work, view from South

63. Turbine building South side

B63. Turbine Hall, view from South

B63. Turbine Hall - civil work, North side


                                                        D01. Ash Storage - Bore piling


L05. Absorber Pile cap preparation

L10. Booster fan foundation work 

L24. FGD duct foundaition work

12.08.2013



B01. Boiler Steel Structure erection,
view from South

B01. Boiler Steel structure erection,
view from North

B02. Chimney - erection Slipform Rig


                                                       B06.  Bunker Bay area remaining work
                                                                       - view from North

B06 Bunker Bay area remaining work -
 general view from South



                                           B07 - Fabric Filter - Pile cap preparation,
                                                                   view from South


B10. ID Fan Pile Cap preparation South

B10. ID Fan North

                                           B33. Unit Electrical Building ground floor work -
                                                                      view from North

B33. Unit Electrical Building ground floor work-
view from East 


                                           B35. Boiler electrical Building, tie beam concrete
                                                   work, view from East                                          

B63. Turbine Hall - Piling work, view North side
           
 



B63. Turbine Hall - piling work, view from North


                                            B63. Turbine Hall erection work, view from West 
B63. Turbine Hall - Piling work view from East


B68. Transformer foundation - rebar installation


D01. Ash storage - Bore piling work


                                           L05. Absorber - Pile cap preparation

L10. Booster fan foundation work


                                           L24. FGD Duct foundation work



                                            Boiler duct preassembly   

Tuesday, 6 August 2013

07.08.2013


B01. Boiler Steel Structure First coloumn installation and Ceramoney