Monday, 19 January 2015

19.01.2015

Boiler south view

Boiler air preheater

Boiler Electrical Building south view

Boiler Electrical Building ground floor

Boiler Electrical Building First floor

Boiler Electrical Building HVAC room

Booster fan

ID fan

Fabric Filters and ash storage

Condensate make up tank

Auxiliary boiler

Light fuel oil pump station unloading area

Compressed air production building

Compressed air production internal view

Compressed air production equipment installation

GRP at aeration basin area

Aeration basin

Aeration basin

Thursday, 15 January 2015

15.01.2015

Turbine building north east view

Boiler north view

Boiler north view

Central control room at Unit Electrical Building

Engineering room at Unit Electrical building

IPBs north view

HV cable trench

Transformers at Unit Electrical Building

Tanks, Industrial Water Pump Station & Water Treatment Plant

Industrial Water Pump Station

Industrial Water Pump Station piping

Water Treatment Plant equipment

Potable water tank

Hazardous goods store

Conveyor C71

Conveyor C71 road crossing

Conveyor C71

Transfer tower C07


Plant north view


Tuesday, 13 January 2015

14.01.2015 Steam Turbine Building

16.0m level

Lube Oil Room








Cube sampling

13.01.2015


Coal conveyor C71 west view

Coal conveyor C71 crossing

Coal conveyor C71 crossing east view

Coal conveyor C71 installation is on going 

Coal conveyor C71

Conveyor structure C71 under installation

Conveyor structure C71

Conveyor structure C71

Conveyor structure C71

Coal crusher house (C05)

Sunday, 11 January 2015

12.01.2015

Turbine hall north view

Turbine hall east view

Turbine hall headers

Turbine hall piping at ground floor

Turbine hall cable trays installation

Turbine hall 8.0m level pipe welding

Turbine hall 8.0m level equipment installation

Turbine hall 8.0m level

Turbine hall 8.0m level

Turbine hall piping erection