Saturday, 26 July 2014

26.07.2014 - Coal handling system erection





Coal Handling System Erection

Junction tower JT02 - Mechanical erection

Transfer Tower TT16

TT17 - Mechanical erection

TT18 Mechanical erection

TT19

TT20 - Mechanical erection





Stack reclaimer erectin A

Stack reclaimer erection B

Crusher house
















Wednesday, 23 July 2014

23.07.2014



                                     HP Heater and Desuper Heater lifting 16m lvl

B6. Turbine hall 16m level - HP Desuperheater 

B63. Turbine hall 16m lvl - HP heater & HP Desuperheater
lifting

HP Desuper heater & HP heater lifting



Lifting & Positioning

Monday, 21 July 2014

21.07.2014 - Auxilary Boiler & Auxilary Transformer at site


Auxilary Boiler item at Site
Part of Auxiliary Boiler Items


B68. Auxiliary Transformer at site (2 Unit)






HP Heater Lifting to Turbine hall










Sunday, 20 July 2014

19.07.2014

B01. Boiler steel structure general view from North

B01. Boiler erection

B01. Boiler piping erection

B01. Boiler and pressure parts erection view from bottom

B01. Boiler rear side

B01. Boiler & Pressure parts erection

B01. Boiler Steel structure general view from East




B01. Boiler Hot & cool Air duct erection


B01. Boiler steel structure erection view from West

B02. Chiner Flue Liner Can ready for lift

B06. Bunker bay area Pulverizer erection


B07. Fabric filter casing erection


B01. Boiler foundation area


B17. Flue gas duct & steel structure erection


B33. Boiler electrical building plastering work, view from East

B33. Unit electrical building view from South


B35. Boiler electrical building cable tray erection


B35. Boiler electrical building 1st floor, switchgear panel

B63. Turbine hall view from North

B63. Turbine hall steel structure erection view from East

B63. Turbine hall Boost pump

B63. Condenser neck welding inprogress

B68. Auxiliary boiler building



B68. Main transformer erection


B63. Turbine hall general view from South


C03_40 Light fuel oil pump station building

C05. Crusher house building


C40. Light fuel oil storage tank erection

C72. Electrical building near Crusher house

C72. Electrical building near Bunker bay area



D01. Ash storage tank

E05. Cooling water piping underground

E50. Outfall Culver Turbine hall to Aeration


G02. Raw water supply tank erection

G05. Damin plant erection


H03. Pipe rack erection near Demin plant

G05. Demin plant erection

G07. Demin storage tank erection

G08. Compressed air building

G16. Industrial waste treatment plant foundation and
Outfall culver Trubine hall to Aeration basin

G17. Auxiliary Boiler foundation

G20. Potable water storage tank erection

G28. Oil & Fire fighting water recovery pit



H03. Pipe rack erection near Demin Plant

L05. Absorber Roof concrete work

L10. Booster at position

L13. Aeration Basin