B01. Boiler Steel structure and Duct erection
View from South

B01. Boiler Girder on position,
View from Bottom

B01. Boiler Girder 3rd on preparation for lift
View from West

B06. Bunker bay area steel structure ,
grating & Silo duct erection view from East

B06. Bunker bay area grating erection

B01. Boiler pressure parts preassembly at site

B02. Chimney erection


B07. Fabric filter area pile cap preparation
and substructure work view from East


B07. Fabric filter area pile cap preparation
and substructure work view from West

B33. Unit Electrical Building,
2nd floor column erection, ground floor
plastering and painting - view from East

B33. Unit electrical building, ground floor painting


B35. Boiler Electrical building,
Ground floor and 1st floor slab concrete
View from North


B63. Turbine Hall - North side excavation

B63. Turbine Hall - North side concrete work

B63. Turbine hall - south side pedestal concrete

B63. Turbine hall - south side


B68. Transfer buildidng firewall concrete


C05. Crusher house foundation work

C40. Light fuel oil storage area retention work

C71. Electrical building crusher house area

C72. Electrical building near bunker area

New Crane assembly

D01. Ash storage foundation work

G05. Demineralized water storage

G25. Storage tank Foundation


Hopper assembly at site

L05. Absorber wall rebar installation