B01. Pressure parts item at site
B01. Pressure Parts items assembling at site
B01. Steel structure Tier 6 & 7, grating,
handrailing & duct erection
B01. Steel structure erection, veiw from West
B06. Bunker Bay area Steel structure and
Silo duct erection, view from East
B02. Chimney erection
B02. Chimney erection, concrete pouring,
currently 93m hight
B07. Fabric filter Substructure at south side
B07. Fabric filter substructure work at North
B02. Fabric filter steel structure pressembly
B33. Unit electrical building,
plastering work, view from North
B33. Unit Electrical building Ground floor
B33. Unit Electrical building 1st floor,
Plastering work
B33. Unit electrical building Transformer area
Emergency Diesel Generator foundation
B35. Boiler electrical building.
B35. Boiler electrical building
Auxiliary transformer building roof erection
B63. Turbine hall basement slab 2b strip concrete
B68. Transformer building oncrete wall
C05. Crusher house foundation
C30. Fuel oil unloading area foundation work
C40. Light fuel oil retention work
C71. Electrical building column erection
C72. Electrical building Foundation work
D01. Ash stroage pile cap preparation
E02. Cooling water piping sleeper foundation
G02. Raw water storage
G05. Demineralized water production foundation
G17. Auxiliary Boiler
pile cap and lean concrete work
G25. Operational Industrial water pump station
L13. Aeration Basin Sheet piling
L05. Absorber Side wall
and Sheet piling for GRP pipe
Silo duct at boiler area for erection