Wednesday, 18 December 2013

18.12.2013

B01. Boiler steel structure & Duct erection
View from South

Grating and handrailing at site

B01. Boiler steel structure, all girder at position,
view from South

B06. Bunker bay steel structure and
Silo duct erection, view from East

B06. Bunker bay area grating

B01. Pressure parts preassembly at site

B06. Silo Duct at site for erection

B02. Chimney erection, concrete pouring

B07. Faric filter area substructure work


B33. Unit electricala building,
plastering and 2nd floor column erection

B33. Unit electrical building Ground floor

B33. Unit electrical building transformer area

B33. Unit electrical building
general view, from West

B35. Boiler electrical building

B35. Boiler electrical building
Auxiliary transformer area

B35. Boiler electrical building ground floor

B63. Turbine hall basement concrete
work, view from North

B63. Trubine hall, excavation
and concrete work, view from South


B68. Main transformer building

C05. Crusher house foundation rebar installation

C40. Light fuel oil storage retention work

C71. Electrical building near Crusher house

C72. Electrical building near bunker bay

D01. Ash storage area pile cap preparation

E05. Cooling water piping sleeper foundation work
 

G02. Raw Water Storage foundation

G05. Demineralized water production foundation

G07. Demineralized water storage

G25. Operational industrial water pump station

G20. Potable water storage foundation

L05. Absorber shell side wall rebar installation

L13. Aeration Basine area sheet piling

L24. FGD Duct foundation

No comments:

Post a Comment

Note: only a member of this blog may post a comment.