B01. Boiler steels structure,
handrail, grating & Duct erection
View from South
B01. Boiler steel structure erection,
View from West
B01. Pressure parts item at site
B01. Pressure parts assembly at site
B02. Chimney erection,
concrete pouring in progress
Bunker bay area grating installation in progress
B06. Bunker bay area Silo duct erection
B07. Fabric filter Substructure work at south side
B07. Fabric filter substructure work at North
Emergency Diesel Generator area
lean concrete work
B33. Unit electrical building.
2nd floor column erection
B33. Unit electrical building transformer area
B35. Boiler Electrical building
2nd floor slab concreting work
B35. Boiler electrical building
Auxiliary transformer building
B63. Turbine hall ready for
concrete pouring in basement
B68. Main Transformer building
C05. Crusher house foundation concrete
C30. Fuel oil unloading area foundation work
C71. Electrical building near crusher house
C72. Electrical building near bunker bay
D01. Ash storage foundation work
E02. Cooling water pumphouse
E05. Cooling water piping sleeper
foundation work
F01. Switch yard area
G17. Auxiliary Boiler area
G25. Operation industrial water
pump station area, foundation concrete
L05. Absorber sheel side wall rebar installation
GRP piping area sheet piling
L13. Aeration basin area sheet piling
Silo duct ready for erection
Coal Handling transfer tower
TT16 - Steel structure erection
TT17. Transfer tower Steel structure erection
TT18 - Transfer tower Foundation work
TT19. Transfer Tower foundation work
TT20. Transfer tower steel structure erection
TT21. Transfer tower steel structure erection
TT22. Transfer tower foundation area
TT23. Transfer tower foundation