Friday, 20 December 2013

20.12.2013


                                           
B01. Boiler steels structure,
handrail, grating & Duct erection
View from South


B01. Boiler steel structure erection,
View from West

B01. Pressure parts item at site

B01. Pressure parts assembly at site

B02. Chimney erection,
concrete pouring in progress


Bunker bay area grating installation in progress

B06. Bunker bay area Silo duct erection

B07. Fabric filter Substructure work at south side

B07. Fabric filter substructure work at North

Emergency Diesel Generator area
lean concrete work

B33. Unit electrical building.
2nd floor column erection

B33. Unit electrical building transformer area

B35. Boiler Electrical building
2nd floor slab concreting work

B35. Boiler electrical building
Auxiliary transformer building

B63. Turbine hall ready for
concrete pouring in basement




B68. Main Transformer building

C05. Crusher house foundation concrete

C30. Fuel oil unloading area foundation work

C71. Electrical building near crusher house

C72. Electrical building near bunker bay

D01. Ash storage foundation work

E02. Cooling water pumphouse


E05. Cooling water piping sleeper
foundation work

F01. Switch yard area

G17. Auxiliary Boiler area

G25. Operation industrial water
pump station area, foundation concrete

L05. Absorber sheel side wall rebar installation

GRP piping area sheet piling

L13. Aeration basin area sheet piling

Silo duct ready for erection

Coal Handling transfer tower
TT16 - Steel structure erection

TT17. Transfer tower Steel structure erection

TT18 - Transfer tower Foundation work

TT19. Transfer Tower foundation work

TT20. Transfer tower steel structure erection

TT21. Transfer tower steel structure erection

TT22. Transfer tower foundation area

TT23. Transfer tower foundation