B01. Boiler Steel structure
Tier 5 & 6 erection, View from West
B01. Boiler steel structure erection Tier 5 & 6,
and Air Duct erection, view from South
B06. Bunker bay area Steel structure
erection and Silo Duct erection, view from South
B07. Fabric Filter area, Lean concrete
and substructure erection, view from West
Girder at site for lift
B33. Unit Electrical building,
ground flooring plastering & painting,
2nd floor column erection, view from South
B33. Unit Electrical building Transfor area,
View from East
B33. Unit Electrical building, 2nd floor
column erection, Ground floor plastering
& painting, view from West
B33. Unit electrical building
ground floor painting
B35. Boiler Electrical Building,
first floor slab concrete work, view from East
B63. Turbine Hall civil work,view from North
B63. Turbine Hall concrete work,
view from South
B68. Transformer building fire wall concrete work
C05. Crusher house foundation
steel rebar installation
C40. Light fuel oil Tank retention work
C71. Electrical building near crusher house,
first floor slab concrete work
C72. Electrical building
near Bunker bay - foundation work
Crane assembly 1200 ton
D01. Ash storage pile cap preparation
G02. Raw water storage tank foundation
G05. Demineralized water proudction foundation
G06. Demineralized water effluents foundation
G25. Operational industrial water pump station
L05. Absorber shell steel rebar installation
and sheet piling
TT16 - Coal Handling system
TT17 - Coal Handling system
Transfer Tower Steel structure erection