Wednesday, 11 December 2013

11.12.2013

                                           B01. Boiler Girder 3rd on position

B01. Steel structure, grating and
duction erection, view from South

B06. Bunker Bay area steel structure,
grating & Silo duction erection, view from East

B01. Silo Duct preparation for erection 

B02. Chimeny erection

B02. Chimeny bottom area, temp. lift erection

B33. Unit electrical building ground floor
plastering, painting and 2nd floor Column erection,
view from North

B33. Unit electrical building 1st floor work

B33. Unit electrical building, transformer area

Emergency Deseal Generator building
foundation work

B35. Boiler electrical building and
Auxiliary transformer area

B63. Turbine hall view from B33 Unit
electrical building

B68. Main transformer building

C05. Crusher house foundation work

C40. Light fuel oil storage area retention work

C73. Electrical Building south of coal yard

C72. Electrical building near Bunker bay
foundation work

750 Ton Crane Assembly

E05. Cooling water piping sliper foundation area

E50. Cooling water culvert, Jack spun pile work

G02. Raw water storage foundation work

G05. Demineralized water production
area concrete slab work

G25. Operational Industrial
water pump station foundation work


L05. Absorber shell wall rebar installation

M07. Cooling water Out fall culvert

Coal handling transfer tower TT17 -
Steel structure erection

No comments:

Post a Comment

Note: only a member of this blog may post a comment.