B01. Steel structure, grating and
duction erection, view from South
B06. Bunker Bay area steel structure,
grating & Silo duction erection, view from East
B01. Silo Duct preparation for erection
B02. Chimeny erection
B02. Chimeny bottom area, temp. lift erection
B33. Unit electrical building ground floor
plastering, painting and 2nd floor Column erection,
view from North
B33. Unit electrical building 1st floor work
B33. Unit electrical building, transformer area
Emergency Deseal Generator building
foundation work
B35. Boiler electrical building and
Auxiliary transformer area
B63. Turbine hall view from B33 Unit
electrical building
B68. Main transformer building
C05. Crusher house foundation work
C40. Light fuel oil storage area retention work
C73. Electrical Building south of coal yard
C72. Electrical building near Bunker bay
foundation work
750 Ton Crane Assembly
E05. Cooling water piping sliper foundation area
E50. Cooling water culvert, Jack spun pile work
G02. Raw water storage foundation work
G05. Demineralized water production
area concrete slab work
G25. Operational Industrial
water pump station foundation work
L05. Absorber shell wall rebar installation
M07. Cooling water Out fall culvert
Coal handling transfer tower TT17 -
Steel structure erection