B01. Boiler pressure parts assembly at site

B01. Boiler steel structure Tier 6&7 and Silo duct
Erection view from South 

B01. Structure erection view from West

B01. Steel structure, grating, hand rail &
Silo duct erection view from North

B06. Bunker bay area Steel structure
and Silo Duct erection, view from East

B07. Fabric Filter area foundation concreting work,
South side, view from East

B07. Fabric Filter area foundation concrete,
North side, view from West

B07. Fabric Filter - steel structure assembly

B33. Unit electrical building,
2nd floor column erection, view from South

B33. Unit electrical building Transformer area

B35. Boiler electrical building 2nd floor
slab concrete work view from East

B35. Boiler electrical building Auxiliary Transformer
building roof concrete, view from West

C05. Crusher house Foundation and column erection

C30. Fuel Oil unloading area sheet pilinng

C40. Light fuel Oil storage area retention work

C71. Electrical building near Crusher house,
1st floor column erection

C72. Electrical building foundation concrete
and steel rebar installation for column erection

D01. Ash storage pile cap preparation

E02. Cooling water piping sleeper foundation

Emergency Diesel Generator foundation

G06. Demineralized water effluents foundation &
 Column erection work

G17. Auxiliary Boiler area pile cap preparation

G25. Operational Industrial water pump station,
foundation work

Hopper assembly at site

L05. Absorber Side wall concrete - rebar installation
Sheet piling for under ground GRP pipe

L13 Aeration basin Sheet piling


Coal Handling Transfer tower
steeel structure erection  - TT16

Coal Handling Transfer tower
steeel structure erection  - TT17

Coal Handling Transfer tower
Foundation  - TT18

Coal Handling Transfer tower
Foundation  - TT19


Coal Handling Transfer tower
steeel structure erection  - TT20

Coal Handling Transfer tower
steeel structure erection  - TT21

Coal Handling Transfer tower
steeel structure erection  - TT22 


Coal Handling Transfer tower
steeel structure erection  - TT23  

Coal Handling Transfer tower
steeel structure erection  - TT24   

Stack Reclaimer A - area

Stack Reclaimer B - area