| Condenser Moduel equipment arrived at site (Condenser Neck) |
| Condenser Moduel equipment arrived at site (Condenser Neck) |
| B01. Boiler steel structure, duct & Pressure parts erection, view from South |
| B01. Boiler steel structure erection - West side |
| B01. Boiler pressure parts header lifting position |
| B01.Boiler pressure parts erection, view from bottom |
| B01. Boiler pressure parts item header for lift |
| B01. Pressure parts item erection, view from bottom |
| B01. Boiler area piping erection |
| B06. Bunker bay area steel structure and Silo duct erection, and Cheminey, view from East |
| B01. Boiler pressure parts assembly at site |
| B01. Boiler pressure parts assembly at site |
| B06. Bunker bay area steel structure & Silo duct erection, view from South |
| B01. Boiler pressure parts lifting position, view from South |
| B01. Boiler steel structure erection West site |
| B01. Boiler steels structure, duct and pressure parts erection, B07. steel structure and hopper erection |
| B01. Boiler steel structure & Pressure parts erection B07. steel structure & Hoppere erection, view from West |
| B06. Bunker bay area Mill fooundation |
| B06. Bunker bay Mill foundation, view from South |
| B07. Fabric filter hopper casing assembly (B17 - area) |
| B07. fabric filter steel structure and hopper erection |
| B07. Fabric filter hopper erection |
| B07. Fabric filter hopper casing assembly |
| B33. Unit electrical building plastering work |
| B33. Unit electrical building ground floor HVAC erection |
| B33. Unit electrical building 1st floor plastering and painting |
| B33. Unit electrical building Transformer building area |
| B33. Unit electrical building general view from South |
| B35. Boiler electrical building, plastering |
| B35. Ground floor painting and HVAC work |
| B35. Boiler electrical building 1st floor painting, HVAC & Fire fighting work |
| B63. Turbine Hall Side wall concrete & rebar installation |
| B63. Turbine Hall South end steel rebar installation for wall |
| B63. Turbine hall concrete wall East side |
| B63. Turbine hall concrete reinforcement work West side |
| B68. Auxiliary transformer building |
| B68. Main transformer building concrete repair work |
c
| C05. Crusher house 1st floor slab concrete pouring |
| C72. Electrical building near Bunker bay area |
| D01. Ash storage foundation concrete |
| E05. Cooling water piping sleeper foundation piling extension |
| E50. Cooling water culvert Tubine hall to Aeration basine - sheet piling |
| F06. Cable way foundation, view from North |
| G05. D. water production Equipment erection |
| G10. Emergency diesel generator foundation |
| G17. Auxiliary boiler foundation |
| G18. Reserve feed water storage |
| G25. Operational industrial water pump station |
| L05. Absorber shell - side wall concrete work |