Saturday, 22 March 2014

22.03.2014


B01. Boiler pressure parts items for lifting position

B01. Boiler Duct for lifting position


B01. Boiler pressure parts item erection,
view from bottom


B01. Boiler pressure parts item pressemly at site

B01. Pressure parts assembly at site



B01. Boiler steel structure, duct and pressure parts erection,
view from South


B01. Boiler steel structure and pressure parts erection,
B07. Fabric filter steel structure and hopper erection
in progress, view from West

B01. Boiler rear side steel structure erection,
view from West

B06. Bunker bay area, Mill foundation completion

B06. Bunker bay area steel structure and Silo duct erection,
view from East

B06. Bunker bay area view from South

B01. Boiler Rear side Steel structure erection,
view from South

B07. Fabric filter area Hopper erection, view from North

B17. Auxiliary Boiler foundation work

B17. Flue gas duct preassembly

B17. Flue gas duct steel structure erection

G18. Reserve feed water storage foundation

B33. Unit electrical building ground floor - door fixing

B33. Unit electrical building 1st floor, HVAC  work

B33. Unit electrical building Transformer area,
4th floor column erection

B33. Unit electrical building view from South

B35. Boiler electrical building ground floor,
plastering and painting work

B35. Boiler electrical building Plastering and painting work,
view from East

B35. Boiler Electrical building 1st floor HVAC work

B63. Turbine hall concrete pedestal, view from North

B63. Turbine hall 0 level slab concrete work, view from
North



B68. Auxiliary Transformer building

B68. Main transformer building

B68. Main transformer building, concrete repair work

C03. Fuel oil pump station foundation work

C05. Crusher house 1st floor column erection

C30. Fuel oil unloading area foundation work

C40. Light fuel oil storage retention work

C71. Electrical building near Crusher house

C72. Electrical building near Bunker bay area


D01. Ash storage foundation area

E05. Cooling water piping sleeper foundation work

E50. Colling water culvert Turbine hall to
Aeration station foundation area sheet piling work


F06.  Cable way foundation transfomer to Switchyard

G05. Demineralized water production equipment erection

G05. Demineralized water production equipment erection

G06. Demineralized water effluent


G25.Operational industrial water pump station foundation work,
view from North

G25. Operation industrial water pump station
foundation and column erection, view from South

G28. Oil & Fire fighting water recovery pit sheet piling

L05. Absorber shell wall  rebar installation

L13. Aeration basin foundation and side wall work

L24. FGD Duct foundation work